Mezzanine · Question

Mezzanine or Racking: Which Approval Do I Need?

A mezzanine is a new floor and counts as floor area. Racking is storage. The approvals differ, and racking on a mezzanine needs both checked.

A mezzanine is an added floor that counts as GFA. It needs the landlord or developer NOC, the permit from the authority for the area with stamped calculations, the approved steel contractor stamp and Civil Defence approval. Racking is storage: it changes the loads on the slab and the fire safety, so it is checked for its loads and DCD approves the storage layout; whether the area authority also issues a permit depends on the area and the racking, and we confirm it for your warehouse. Racking on a mezzanine is checked and approved with the mezzanine.

MezzanineAdded floor, counts as GFA
RackingStorage, loads and fire safety
Racking on a mezzanineChecked with the mezzanine

What you need to know

  • Mezzanine: A floor people walk on.
  • Racking: Storage shelving and pallet racking.
  • Both: Loads and fire safety change.
  • We confirm: The route for your area and racking.

Documents you will need

  • Trade licence and tenancy contract, or title deed for owners
  • Landlord, building management or master developer NOC
  • Existing or as-built drawings of the unit or villa
  • Mezzanine drawings with stamped structural calculations
  • Fire safety drawings for Civil Defence

By situation

Which route

We confirm the route for your building and area.

Your planApproval routeGuides
Mezzanine
Full mezzanine route
NOC, authority, steel stamp, DCD.Mezzanine NOC
Racking only
Load check and DCD
Authority by area.—
Racking on a mezzanine
Checked together
With the mezzanine.JAFZA racking
DSO

How it works

How we get your mezzanine approved

1. Site and slab review

The unit, the existing slab and columns, and what the mezzanine is for.

2. Existing drawings

From the landlord, developer or authority; if missing or out of date, we survey and draw as built.

3. Design and calculations

Mezzanine drawings, steel design and stamped structural calculations, with the added floor area shown.

4. NOC

Landlord, building management or master developer NOC.

5. Permit and Civil Defence

The authority for the area approves the structure; the approved steel contractor stamps the steel; DCD approves fire safety.

6. Build, inspect, complete

The mezzanine is built as approved, inspected, and the completion certificate is issued.

Who does what

Who approves a mezzanine

🏢

Landlord or developer

Gives the NOC for the mezzanine. It comes first.

🏛️

Authority for the area

Dubai Municipality, DDA, Trakhees, DSO Authority, Dubai South Authority or DMCC approves the structure with stamped calculations.

Who approves? →
🔩

Approved steel contractor

A steel mezzanine needs the stamp of an approved steel contractor (also called a steel specialist).

Steel contractor stamp →
🚒

Dubai Civil Defence

Every mezzanine needs DCD approval for fire safety and escape.

Civil Defence and mezzanines →

What we prepare

Why mezzanine submissions get returned

  • Mezzanine built before approval
  • No landlord or developer NOC
  • Drawings that do not match the unit as built
  • Slab and columns not checked for the new loads
  • Steel without the approved steel contractor stamp
  • Added floor area not shown
  • No Civil Defence fire safety drawings

Questions

Questions owners and tenants ask

Is racking the same as a mezzanine?

No. A mezzanine is a floor; racking is storage.

Does racking need Civil Defence approval?

DCD approves the storage layout and fire safety.

Can I put racking on my mezzanine?

Only after the mezzanine and slab are checked for it.