Structural Assessment · Shared Walls

My neighbour's extension cracked our shared wall: what now?

Get a structural assessment and report. We inspect the wall, record the damage and recommend the repair; a contractor carries out the repair.

Get the wall assessed before anything else. Structural Solutions inspects the shared wall, records the cracks and any movement, checks the cause, and issues a stamped structural report with recommendations. The repair is then carried out by a contractor, following the report. Building next to a shared wall needs the neighbour's consent, and the report documents the condition of the wall for you and for the developer or authority.

Step 1Structural assessment
Step 2Stamped report
RepairBy a contractor

What you need to know

  • Neighbour consent: Building next to a shared wall needs the neighbour's consent.
  • Assessment: We inspect, record and check the cause.
  • Report: Stamped findings and recommendations.
  • Repair: Carried out by a contractor, following the report.

Documents you may need

  • Title deed and owner ID
  • Affection plan or site plan
  • Existing drawings or as-built drawings
  • Photos of the area
  • Developer NOC (where the community has a developer)

Who does what

Step by step

We confirm the exact route for your project.

StepApproval routeGuides
Site visit
Structural Solutions
We inspect the structure, the cracks, the loads and any changes made.—
Checks and calculations
Structural Solutions
We check the structure against the loads and the codes.Structural calculations
Stamped report
Structural Solutions
Findings and recommendations in a stamped report.Structural reports
Repairs
A contractor
Repairs are carried out by a contractor, following the report.—
Approvals
Developer and authority
Where repairs or changes need a NOC or permit, we apply.Approvals

Questions

Related questions

Is a cracked shared wall dangerous?

It depends on the cracks and their cause. An assessment tells you.

Do you repair the wall?

No. We assess and report; a contractor carries out the repair.

Can the report be shared with the developer?

Yes. It documents the condition of the wall.

Did my neighbour need my consent?

Yes. Building next to a shared wall needs the neighbour's consent.

Related guides

Keep reading