Dubai South · Warehouses

Dubai South Warehouse Structural Approval: Calculations, Racking and Extensions

Structural works in Dubai South warehouses need stamped calculations, the Dubai South Authority permit, DCAA and Civil Defence.

In Dubai South, warehouse works such as mezzanines, racking, extensions, canopies, steel structures, crane and gantry beams, roof solar panels and heavy floor loads need stamped structural calculations. The landlord NOC comes first, then the Dubai South Authority permit, DCAA approval and Civil Defence approval. Steel works need the approved steel contractor stamp.

FirstLandlord NOC
PermitDubai South Authority
AlsoDCAA and DCD

What you need to know

  • Calculations: Stamped by a structural engineer.
  • Slab: Checked for racking, machines and mezzanine columns.
  • Steel: Approved steel contractor stamp.
  • Existing building: Surveyed and assessed where drawings are missing.

Documents you will need

  • Trade licence and lease, or title deed for owners
  • Landlord, building management or developer NOC
  • Existing or as-built drawings
  • Drawings and stamped structural calculations for the works
  • Fire safety drawings for Civil Defence

By property

Works we cover

We confirm the route for your property.

WorksApproval routeGuides
Mezzanine
Calculations and approvals
Counts as added floor area.Mezzanines
Racking
Load check
Slab and fire safety.Racking
Extension, canopy or shed
Steel design
Stamped calculations.—
Crane or gantry beam
Structural check
Columns and connections.—
Roof solar panels
Roof check
Loads and fixings.Solar

How it works

How we get your Dubai South approval

1. Review

The property, the works and the drawings you have.

2. Drawings

Existing drawings, or a survey and as-built drawings, then the design and stamped calculations.

3. NOC

Landlord, building management or developer NOC.

4. Dubai South Authority

We submit through the online system as a registered consultant.

5. DCAA and Civil Defence

DCAA approval for the project, and DCD approval for fire safety.

6. Works and completion

A registered contractor builds; inspection and completion follow.

Who does what

Who approves works in Dubai South

🏢

Landlord, building management or developer

Gives the NOC for the works. It comes first.

🏛️

Dubai South Authority

Issues the permit for works in Dubai South. The consultant and the contractor must be registered with it.

What is Dubai South Authority? →
✈️

Dubai Civil Aviation Authority (DCAA)

Approves projects in Dubai South.

DCAA approval →
🚒

Dubai Civil Defence

Approves and inspects fire safety.

What we prepare

Why Dubai South submissions get returned

  • NOC missing
  • Consultant or contractor not registered with Dubai South Authority
  • Drawings that do not match the property
  • Structural changes without stamped calculations
  • DCAA approval not obtained
  • Fire safety not coordinated with Civil Defence
  • Works started before approval

Questions

Questions owners and tenants ask

Do I need structural calculations for my Dubai South warehouse?

Yes, for structural works, racking, mezzanines and heavy loads.

Who approves warehouse works in Dubai South?

Dubai South Authority, with DCAA and Civil Defence.

Can my slab take racking?

We check it against the racking loads.

Related guides

Keep reading