Dubai South Roof Solar Panel Structural Calculations

Roof solar panels add load and wind forces to the roof. The roof is checked and the calculations stamped for the approval.

The short answer

Before solar panels go on a warehouse or building roof in Dubai South, the roof structure is checked for the panels, the mounting frames and wind, and the fixings are designed. The stamped calculations go with the submission: landlord NOC, Dubai South Authority, DCAA and the other approvals for the solar system.

ChecksRoof, frames and fixings
StampedBy a structural engineer
ApprovalDubai South Authority and DCAA

What you need to know

  • Roof capacity: Purlins, rafters and sheeting.
  • Wind: Uplift on the panels.
  • Fixings: Designed and shown.

Documents you will need

  • Trade licence and lease, or title deed for owners
  • Landlord, building management or developer NOC
  • Existing or as-built drawings
  • Drawings and stamped structural calculations for the works
  • Fire safety drawings for Civil Defence

By property

Route by type of property

We confirm the route for your property.

PropertyApproval routeGuides
Warehouse or logistics unit
Landlord NOC, Dubai South Authority, DCAA, DCD
Structural works with stamped calculations.Warehouses
Office fit-out
Landlord or building NOC, Dubai South Authority, DCAA, DCD
Fit-out drawings.Offices
Restaurant or shop
NOC, Dubai South Authority, DCAA, DCD
Plus food safety layout for restaurants.—
Apartment or villa
Building management or developer NOC, Dubai South Authority, DCAA
Residential District.Homes
Emaar South villa
Emaar NOC, Dubai South Authority, DCAA
Not DDA.—

How it works

How we get your Dubai South approval

1. Review

The property, the works and the drawings you have.

2. Drawings

Existing drawings, or a survey and as-built drawings, then the design and stamped calculations.

3. NOC

Landlord, building management or developer NOC.

4. Dubai South Authority

We submit through the online system as a registered consultant.

5. DCAA and Civil Defence

DCAA approval for the project, and DCD approval for fire safety.

6. Works and completion

A registered contractor builds; inspection and completion follow.

Who does what

Who approves works in Dubai South

🏢

Landlord, building management or developer

Gives the NOC for the works. It comes first.

🏛️

Dubai South Authority

Issues the permit for works in Dubai South. The consultant and the contractor must be registered with it.

What is Dubai South Authority? →
✈️

Dubai Civil Aviation Authority (DCAA)

Approves projects in Dubai South.

DCAA approval →
🚒

Dubai Civil Defence

Approves and inspects fire safety.

What we prepare

Why Dubai South submissions get returned

  • NOC missing
  • Consultant or contractor not registered with Dubai South Authority
  • Drawings that do not match the property
  • Structural changes without stamped calculations
  • DCAA approval not obtained
  • Fire safety not coordinated with Civil Defence
  • Works started before approval

Questions

Questions owners and tenants ask

Can my roof take solar panels?

We check it for the panels, frames and wind.

Do I need calculations?

Yes, stamped for the submission.