Dubai South Aviation District Hangar Approval
Hangars are large-span steel buildings on airside or near it, with aviation rules on top of the usual building approvals.
A hangar in the Dubai South Aviation District is approved through Dubai South Authority, with DCAA for aviation and Civil Defence (DCD) for fire and life safety; in the aviation district, DACC (Dubai Aviation City Corporation) is a separate approval as well. Hangars are large-span steel structures with big doors, crane rails and heavy floor loads from aircraft and equipment. We design the structure, including the steel frame, door supports and floor slab, prepare the drawings and handle the submissions.
Route
Who approves in Dubai South
Emaar South follows its own developer route; see the guides below.
| Step | Who | Guide |
|---|---|---|
| NOC | Developer, landlord or building management | the fit-out NOC |
| Permit | Dubai South Authority | Dubai South Authority |
| Aviation | DCAA | DCAA NOC in Dubai South |
| Fire and life safety | DCD | Civil Defence approval |
Structure
What a hangar structure involves
| Element | What we design |
|---|---|
| Steel frame | Large clear span |
| Hangar doors | Supports and deflection limits |
| Floor slab | Aircraft and equipment loads |
| Crane rails, if any | Rail supports and loads |
| Related | Dubai South warehouse structure |
Official sites: Dubai Civil Defence
What you need to know
- Dubai South Authority permit.
- DCAA and DACC.
- DCD for fire.
- Steel designed by us.
Documents you will need
- Title deed or lease
- Developer or landlord NOC
- Existing approved drawings
- Trade licence
How it works
Dubai South Aviation District Hangar Approval, step by step
1. Brief
Hangar.
2. Design
Steel, slab.
3. NOC
Developer.
4. Permit
Dubai South.
5. Aviation
DCAA, DACC.
6. DCD
Fire safety.
Questions
Dubai South Aviation District Hangar Approval: questions
Who approves a hangar in Dubai South?
Dubai South Authority, with DCAA, DCD and a separate DACC approval in the aviation district.
Do you design hangar structures?
Yes, the steel frame, door supports and floor slab.
Is DACC the same as Dubai South Authority?
No, DACC is a separate approval in the aviation district.
How much does it cost?
Our fee depends on the drawings and the scope; we review and advise.
Who can help?
Structural Solutions handles approvals in Dubai South with Dubai South Authority, DCAA and DCD. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.
Related guides
