Villa · Mezzanine

Should I Prepare Drawings With and Without the Mezzanine?

If you have not decided yet, two options help you compare structure, GFA and layout before choosing what to submit.

If you are unsure, we can prepare the design with and without the mezzanine so you can compare the added GFA, the structure and the layout, and sometimes the lift position. The developer and the authority approve the option you choose, so you submit one option for approval.

CompareGFA, structure, layout
SubmitThe option you choose
Useful forMezzanine and lift decisions

What you need to know

  • GFA: The mezzanine adds floor area.
  • Structure: Different supports for each option.
  • Lift: Its position can change with the mezzanine.

Documents you will need

  • Title deed and Emirates ID of the owner
  • Approved or as-built drawings of the villa
  • Mezzanine drawings with stamped structural calculations
  • Developer or master community NOC
  • Fire safety drawings for Civil Defence

By situation

Villa mezzanine route by community

We confirm the route for your building and area.

CommunityApproval routeGuides
Nakheel communities (Palm, Jumeirah Park, Jumeirah Islands, Al Furjan)
Nakheel NOC, then Trakhees
Counts as GFA.Trakhees villas
Jumeirah Golf Estates
JGE NOC, then Trakhees
Counts as GFA.JGE
Jebel Ali Village
Nakheel NOC, then Trakhees
Counts as GFA.Jebel Ali Village
Emaar communities such as Arabian Ranches and Dubai Hills
Emaar NOC, then DDA
Counts as GFA.—
Dubai Municipality areas
Approved consultant submits to DM
Counts as GFA.—

How it works

How we get your mezzanine approved

1. Site and slab review

The unit, the existing slab and columns, and what the mezzanine is for.

2. Existing drawings

From the landlord, developer or authority; if missing or out of date, we survey and draw as built.

3. Design and calculations

Mezzanine drawings, steel design and stamped structural calculations, with the added floor area shown.

4. NOC

Landlord, building management or master developer NOC.

5. Permit and Civil Defence

The authority for the area approves the structure; the approved steel contractor stamps the steel; DCD approves fire safety.

6. Build, inspect, complete

The mezzanine is built as approved, inspected, and the completion certificate is issued.

Who does what

Who approves a villa mezzanine

🏘️

Master developer

Gives the NOC for the villa, through its portal or community team.

🏛️

Authority for the community

Dubai Municipality, DDA or Trakhees issues the building permit.

Villa route →
🚒

Dubai Civil Defence

Every mezzanine needs DCD approval.

Civil Defence →

What we prepare

Why mezzanine submissions get returned

  • Mezzanine built before approval
  • No landlord or developer NOC
  • Drawings that do not match the unit as built
  • Slab and columns not checked for the new loads
  • Steel without the approved steel contractor stamp
  • Added floor area not shown
  • No Civil Defence fire safety drawings

Questions

Questions villa owners ask

Can I submit both options?

You submit the option you choose.

Why prepare two?

To compare before deciding.