DLTM · Mismatch

DLTM Coordinates Not Matching the Site: What It Means

When DLTM drawings do not match the site, either the drawing was not tied to a survey or the works were built off the plot line. A fresh survey shows which.

If walls, paving or access on site do not line up with the DLTM drawing, there are two usual causes: the drawing was never tied to surveyed points, or the works were built in a different place from the plot limit. A fresh DLTM site survey shows which one it is. If the drawing was wrong, it is corrected; if works sit outside the plot limit, they are shown as they are so they can be resolved with the developer or authority.

Cause 1Drawing not surveyed
Cause 2Works off the plot line
First stepFresh DLTM survey

What you need to know

  • Drawing error: Corrected to the survey.
  • Works outside the plot: Shown as built, then resolved.
  • Road reserve: Works there involve RTA.
  • Before NOCs: Check early to avoid returned applications.

Documents you will need

  • Affection plan or site plan
  • Any existing drawings: PDF or AutoCAD
  • Photos of the plot and the area of works
  • What the drawings are for: developer NOC, RTA or other

By submission

Where DLTM drawings are needed

We confirm the format for your submission.

SubmissionApproval routeGuides
Developer NOC
AutoCAD DLTM plus PDF
Especially near the plot limit.Developer NOCs
Nakheel plot access
PDF plus AutoCAD DLTM
Common reason for returns.Nakheel
RTA access or ROW NOC
DLTM drawings
Plot vs road reserve.RTA
Demarcation or plot limit
Plot limit drawing
Inside vs outside.Plot limit

How it works

How we prepare DLTM drawings

1. Purpose

Which developer or authority the drawings are for.

2. Site survey

Plot, buildings, boundary, kerbs and features in DLTM.

3. Drawings

Existing and proposed works drawn in true DLTM position.

4. Plot limit

What is inside and outside the plot shown clearly.

5. Check

Drawing checked against the survey points.

6. Delivery

AutoCAD DWG plus PDF, ready to submit.

Who asks for it

Who asks for DLTM drawings

🏘️

Master developers

Ask for AutoCAD DLTM drawings with NOCs, especially near the plot limit.

Developer NOCs →
🛣️

Authorities such as RTA

Check works against the plot and the road reserve in DLTM.

DLTM for RTA →
📐

Structural Solutions

Site survey in DLTM and AutoCAD drawings in true position, PDF plus DWG.

Our DLTM survey →

Why DLTM drawings get returned

  • Drawing on a local grid, not in DLTM
  • PDF only, no AutoCAD file
  • Drawing not tied to a site survey
  • Plot limit not shown
  • Works on the drawing not matching the site

Questions

Questions owners and consultants ask

Why do my DLTM drawings not match the site?

The drawing was not surveyed, or the works were built off the plot line.

How do I find out which?

A fresh DLTM site survey.

What if works are outside my plot?

They are shown as built and resolved with the developer or authority.