The Springs · Emaar · Villa

The Springs Villa Second Floor Addition: Is It Possible?

A Springs villa second floor addition is possible in some villas, after an engineer confirms the structure can carry it and Emaar approves the added area within the 10% allowance.

The short answer

Adding rooms upstairs in a Springs villa depends first on the structure: the slabs, columns and foundations must carry the new load, or be strengthened. The added area counts toward the extension allowance. Villas in The Springs can extend by up to 10% of the existing floor area, per Emaar. Anything above 10% is strictly reviewed by Emaar management and may not be approved. It needs an Emaar NOC and a Dubai Municipality permit with stamped calculations.

Developer NOCEmaar Community Portal
AuthorityDubai Municipality
PlansEmaar provides as-built plans
The Springs villa second floor addition

What we check first

  • Plot and setbacks: where an extension, pergola or pool can go on your plot.
  • Structure: walls, slabs, columns and foundations before any opening or new load.
  • Existing floor area: measured from the as-built plans, so the extension allowance is right.
  • Unapproved works: older changes are surveyed and approved before new works.

Documents you will need

  • Photos of the villa and the area you want to change
  • Villa and plot number in The Springs
  • Title deed and owner ID
  • A sketch or short description of the idea
  • Emaar as-built plans, if you have them

Who does what

The approval route in The Springs

The Springs is part of Emirates Living: Emaar first, then Dubai Municipality. We confirm the exact route for your villa.

StepApproval routeGuides
Design
Structural Solutions
Site check, drawings and stamped structural calculations, using the as-built plans Emaar provides.—
Emaar NOC
Emaar Community Management
NOC through the Emaar Community Portal. Emaar reviews the design and confirms its fees.Emaar extension fees
Permit
Dubai Municipality
Building permit for structural works and added floor area, submitted by an approved consultant.—
Inspections
Emaar and Dubai Municipality
Inspections during and after the works; the order can vary.—
Completion
Dubai Municipality
Completion certificate that closes the permit; Emaar then closes its file.—

How it works

How it works in The Springs

Tell us the idea

Villa number, photos and what you want to change.

We check and design

Emaar as-built plans, a site check, drawings and stamped calculations where needed.

We get it approved

Emaar NOC, then the Dubai Municipality permit where the works are structural.

What each work needs in The Springs

  • Extension: up to 10% per Emaar, Emaar NOC, Dubai Municipality permit and stamped calculations
  • Wall removal: structural check, Emaar NOC and Dubai Municipality permit
  • Balcony closure: Emaar NOC and Dubai Municipality permit; it adds floor area
  • Pergola or car shade: Emaar NOC, stamped calculations and a steel contractor stamp for steel
  • Pool: Emaar NOC, Dubai Municipality permit and the DM environmental NOC
  • External colour or façade: Emaar NOC
  • Internal finishes only: usually no permit; check with Emaar first

Questions

Questions owners ask in The Springs

Can I add a second floor to my Springs villa?

In some villas, over a single-storey part, if the structure can carry it and Emaar accepts the design and added area.

How much area can I add upstairs?

Villas in The Springs can extend by up to 10% of the existing floor area, per Emaar. Anything above 10% is strictly reviewed by Emaar management and may not be approved.

Does the structure need strengthening?

Sometimes. We check the slabs, columns and foundations and design strengthening where needed.

Can my columns carry rooms upstairs?

Not always without changes. An engineer checks them against the new loads at design stage.

What approvals are needed?

An Emaar NOC through the Emaar Community Portal and a Dubai Municipality building permit.

Last checked: October 2026. Official sources: Emaar · Dubai Municipality · DEWA

Related guides

Keep reading