Dubai Hills Garden Works NOC: Sheds, Decks and Shade

Dubai Hills garden works, such as a covered terrace, shed, pool deck or pergola, need an Emaar NOC. Anything fixed with a foundation or roof also needs a DDA permit.

Garden works in Dubai Hills need an Emaar NOC, and anything with a fixed foundation or roof also needs a DDA building permit. Sheds should be lightweight and at most 3 m x 3 m, paving up to 0.3 m high, and planters up to 0.6 m, subject to Emaar’s review. BBQs and open showers belong in the backyard and below the boundary wall height. Trees stay at least 1.5 m from boundary walls, and common areas cannot be used.

ShedAt most 3 m x 3 m
Fixed structuresEmaar NOC and DDA
Trees1.5 m from walls

Emaar’s rules

Garden and landscaping rules

Emaar reviews every application, so these are subject to its review.

ItemWhat to expect
Paving and deckingInside the plot, up to 0.3 m high.
PlantersUp to 0.6 m high, on the inner side of the boundary wall.
BBQ, wall features, open showersBackyard only, below the boundary wall height, on their own wall.
TreesAt least 1.5 m from boundary walls.
Common areasNo planting, paving or lighting on footpaths and road verges.

Emaar’s rules

Pool house, store room and garden shed rules

Emaar reviews every application, so these are subject to its review.

ItemWhat to expect
Pool houseIn the back garden within the setbacks, or against the shared boundary wall with a neighbour NOC. The size is reviewed by Emaar.
Shed materialsLightweight only: wood, aluminium or PVC, in the villa’s colour.
Shed sizeAt most 3 m x 3 m, and no higher than the boundary wall.
Shed locationWithin the building lines, without using the boundary walls.
Wet areasNo toilets or wet areas in a store room or shed.
Pump roomsNo taller than the boundary wall. In the front yard they must be underground.

Official sites: Emaar · Dubai Development Authority (DDA)

What you need to know

  • Covered terraces: If enclosed, they add GFA.
  • Boundary walls: Shades cannot be fixed to them.
  • Common areas: No planting, paving or lights on footpaths and verges.
  • Wet areas: No toilets in a shed.

Documents you will need

  • Title deed and owner ID
  • Architectural drawings and elevations, existing and proposed
  • Detailed scope of works
  • Photos of the villa
  • Contractor or consultant licence
  • Coloured 3D concept
  • Affection plan
  • Building Completion Certificate

How it works

From idea to approval

1. Check

We check your idea and your villa’s plans.

2. Drawings

Drawings and stamped calculations, using the as-built plans Emaar provides.

3. Emaar NOC

We apply for you.

4. DDA permit

The building permit for structural works.

5. Works

Built as approved, with contractor entry permits.

6. Completion

Final inspections and the completion certificate.

Who does what

Who approves works in Dubai Hills

🏘️

Emaar

Reviews the design, issues the NOC and confirms its fees.

What is an Emaar NOC? →
🏛️

Dubai Development Authority (DDA)

Issues the building permit for structural works in Dubai Hills Estate, after the Emaar NOC.

Is Dubai Hills under DDA? →
📐

Structural Solutions

Checks your idea, prepares drawings and stamped calculations, and handles the NOC and permit.

Dubai Hills approval guide →

Why applications come back

  • Design does not follow Emaar’s rules
  • Materials or colours do not match the villa
  • Drawings or Building Completion Certificate missing
  • Works started before the NOC

Emaar GFA rates

Emaar extension fees per sq ft

Emaar charges on the added gross floor area (GFA). These rates apply across Emaar communities and are subject to Emaar's review and Emaar Management approval.

Added GFARate (AED per sq ft)Approval
Villas: up to 10%AED 1,000Emaar NOC review
Villas: 10% to 20%AED 3,000Subject to Emaar Management approval
Villas: 20% to 30%AED 6,000Subject to Emaar Management approval
Villas: above 30%AED 6,000Subject to Emaar Management approval
TownhousesAED 1,000Within the townhouse limits, no higher bands

Villa extensions above 10% are not automatic: Emaar Management decides case by case. Emaar confirms the final amount when it reviews the application. The DDA permit fee is separate.

Questions

Questions owners ask

Do I need a NOC for garden works?

Emaar needs to approve garden structures. Soft landscaping is simpler, so tell us what you plan.

How big can a shed be?

At most 3 m x 3 m, and no higher than the boundary wall.

Do I need a DDA permit?

For anything with a fixed foundation or roof.

Can I plant on the verge?

No, common areas cannot be used.