Survey-based DLTM drawings mark the plot limit and every item outside it, so reviewers can approve with confidence.
Works Outside Plot Limit Approval Dubai
Any work outside your plot limit — driveway aprons, interlock, kerb cuts, landscaping or structures on the verge — needs approval from the developer and/or authority that controls that land. DLTM drawings show exactly what is outside.
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Streamlined
Approval process
End-to-end
NOC to permit, managed
Direct access
To your project team
Always on
Client support
Who Approves
RTA for road reserve works, the master developer for community land, and the relevant authority for the area.
How We Prepare DLTM Drawings
01
Site Visit & Survey
02
Survey Points Fixed in DLTM
03
AutoCAD Drawings Prepared
04
Plot Limit & Works Shown
05
PDF + DWG Package Issued
06
Developer / Authority Submission
How Our Approval Process Works
Our expert engineers handle the entire NOC process, ensuring faster approvals and full compliance with Dubai regulations.
Showing It Clearly
Work We Prepare DLTM Drawings For
Driveway Apron
Interlock
Kerb Cut
Verge Landscaping
Gate Ramps
Structures Over Boundary
Works Outside Plot Limit Approval Dubai at a Glance
| Step | Who | What happens |
|---|---|---|
| 1 | Structural engineer | Surveys the site and prepares drawings to the format of the developer and the authority. |
| 2 | Master developer (where the community has one) | Issues the community NOC against its design guidelines. |
| 3 | Building authority — Dubai Municipality, DDA or Trakhees — depending on the community | Building permit; work starts only after it is issued. |
| 4 | Developer and authority | Completion inspection and sign-off. |
Documents Required
- Title deed (or tenancy contract plus landlord NOC for tenants)
- Owner passport and Emirates ID copy
- Affection plan / site plan
- Any existing drawings (PDF or CAD)
- Access to the site for the survey
Key Technical Rules
- Survey-based: drawings are prepared from our own site survey, not traced from old PDFs.
- Authority format: prepared to the submission format of DM, DDA or Trakhees as required.
- DLTM where required: developers and authorities ask for AutoCAD in DLTM coordinates for works near or outside the plot limit.
- Existing and proposed: both sets are shown so reviewers can see the change.
- PDF and DWG: issued in both formats for submission.
Site Survey
Our own team
Authority Format
DM, DDA, Trakhees
PDF + DWG
Ready to submit
Why Owners and Contractors Choose Structural Solutions
Drawings From Our Own Site Survey
We survey the site and prepare the AutoCAD drawings in DLTM coordinates ourselves — not traced from a PDF.
Plot Limit Shown Clearly
Works within and outside the plot limit, demarcation lines and existing features are shown the way developers and authorities expect.
Ready for Submission
AutoCAD (DWG) in DLTM plus PDF sets, coordinated with the NOC or permit you are applying for.
Get Your DLTM Drawings Prepared
Send us your location, affection plan and what the drawings are for — we will arrange the site survey and prepare AutoCAD DLTM drawings ready for submission.
Works Outside Plot Limit Approval Dubai — FAQs
Do I need approval for works outside my plot?
Yes — from the developer and/or authority controlling that land.
How do I show it?
With DLTM drawings from a site survey.
What is DLTM?
DLTM (Dubai Local Transverse Mercator) is the local coordinate system used for surveys and drawings in Dubai.
Who asks for DLTM drawings?
Mainly master developers and authorities — especially to show works within or outside the plot limit, and for demarcation works.
Do you survey the site?
Yes — we prepare DLTM drawings based on our own site survey.