The survey is drafted into AutoCAD and reviewed by our engineers, producing as-built drawings ready for design work or submission.
Measured Survey Dubai
A measured survey records the exact dimensions of a villa, apartment or building on site. It is the basis for as-built drawings, renovation designs and authority submissions in Dubai.
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Streamlined
Approval process
End-to-end
NOC to permit, managed
Direct access
To your project team
Always on
Client support
What We Measure
Room dimensions, wall positions and thicknesses, openings, levels, structural elements, external works and site boundaries — everything needed to produce accurate AutoCAD drawings.
How We Prepare Your Drawings
01
Site Visit & Measured Survey
02
Existing Documents Reviewed
03
AutoCAD Drafting
04
Engineer Review
05
Stamped Drawings Issued
06
Submission Support
How Our Approval Process Works
Our expert engineers handle the entire NOC process, ensuring faster approvals and full compliance with Dubai regulations.
From Survey to Drawings
Common Projects We Handle
Villa Survey
Apartment Survey
Warehouse Survey
Office or Retail Unit
Site & Boundary Survey
Pre-Purchase Survey
Measured Survey Dubai at a Glance
| Step | Who | What happens |
|---|---|---|
| 1 | Structural engineer | Surveys the site and prepares drawings to the format of the developer and the authority. |
| 2 | Master developer (where the community has one) | Issues the community NOC against its design guidelines. |
| 3 | Building authority — Dubai Municipality, DDA or Trakhees — depending on the community | Building permit; work starts only after it is issued. |
| 4 | Developer and authority | Completion inspection and sign-off. |
Documents Required
- Title deed (or tenancy contract plus landlord NOC for tenants)
- Owner passport and Emirates ID copy
- Affection plan / site plan
- Any existing drawings (PDF or CAD)
- Access to the site for the survey
Key Technical Rules
- Survey-based: drawings are prepared from our own site survey, not traced from old PDFs.
- Authority format: prepared to the submission format of DM, DDA or Trakhees as required.
- DLTM where required: developers and authorities ask for AutoCAD in DLTM coordinates for works near or outside the plot limit.
- Existing and proposed: both sets are shown so reviewers can see the change.
- PDF and DWG: issued in both formats for submission.
Site Survey
Our own team
Authority Format
DM, DDA, Trakhees
PDF + DWG
Ready to submit
Why Owners Choose Structural Solutions for Drawings
Measured On Site
Our team surveys the property in person, so the drawings show what is actually built.
Authority-Ready Formats
Drawings prepared in AutoCAD to the format the reviewing authority or developer expects — DM, DDA, Trakhees or developer requirements.
Engineer Reviewed & Stamped
Every set is reviewed by our engineers and can be stamped for submission.
Get Your Drawings Prepared
Tell us about your property and what the drawings are for — we will survey, draft and deliver drawings ready for submission.
Measured Survey Dubai — FAQs
What is a measured survey?
An on-site survey recording the exact dimensions of a property.
What is it used for?
As-built drawings, renovation design and authority submissions.
Do you produce CAD drawings?
Yes, in AutoCAD.
Do you survey warehouses?
Yes.
Can you survey before I buy?
Yes.
