Trakhees · CED

Trakhees CED Industrial Structural Calculations

Industrial works in Trakhees areas such as JAFZA need structural calculations and drawings in Trakhees CED format, stamped by a registered consultant.

Trakhees Format

Drawings and calculations follow Trakhees CED submission requirements.

Free-Zone NOCFirst approval
Load CheckSlab, roof, racking
Civil DefenceFire and life safety

What you need to know

  • Common Works: Mezzanines, racking, steel structures, canopies, extensions and change of use.
  • Free-zone or developer NOC: JAFZA, DIP, Dubai South and other zones approve works first.
  • Authority permit: from the authority for the zone.
  • Civil Defence: fire and life safety approval for the activity.
  • Slab and roof loads: racking, mezzanines and cranes are checked against the structure.
  • Completion inspection: before operation.

Documents you will need

  • Trade licence
  • Lease agreement
  • Master developer or free-zone NOC
  • Layout, racking and equipment details
  • Proposed drawings and stamped structural calculations

At a glance

Trakhees CED Industrial Structural Calculations at a glance

Who does what, step by step.

WhoApproval routeGuides
Structural engineer
Step 1
Designs structural changes, mezzanines and racking supports and prepares stamped drawings and calculations.—
Master developer or free zone
Step 2
Issues the NOC for the works.—
Authority — Trakhees
Step 3
Reviews the drawings and issues the permit.—
Civil Defence (DCD)
Step 4
Fire and life safety approval where required.—
Landlord and authority
Step 5
Completion inspection.—

How it works

How We Deliver Industrial Structural Approvals

Site Visit & Existing Drawings

Structural Assessment

Design & Stamped Calculations

Landlord / Zone NOC

Authority Approval

Installation & Sign-Off

Who does what

Who does what

🏘️

Master developer

Nakheel, wasl (JGE) or JAFZA, depending on the area. Its NOC comes first.

Trakhees communities →
🏛️

Trakhees

Civil Engineering Department (CED): building permit for structural works and inspection at completion.

Trakhees approval →
📐

Structural Solutions

Prepares the drawings and stamped calculations and submits for you as the approved consultant.

Talk to our engineers →

Industrial Works We Handle

  • JAFZA Warehouse
  • Mezzanine
  • Racking
  • Steel Structure
  • Canopy
  • Change of Use

Why applications come back

  • Drawings not in the format Trakhees asks for
  • No stamped structural calculations
  • Developer NOC missing
  • Unapproved works already on site
  • Missing owner documents

Questions

Questions owners ask

What does Trakhees need for industrial works?

Stamped calculations and drawings in Trakhees CED format.

Who stamps industrial structural calculations?

An authority-registered structural consultant — for Trakhees, DM, DDA or Dubai South Authority depending on the location.

Do you check the existing structure?

Yes — slabs, columns, roofs and foundations are checked before new loads are added.

Can unapproved structures be regularised?

Often yes, with an assessment, calculations and a retrospective approval.

Is Civil Defence involved?

Often — fire and life safety approval is needed for many industrial activities.