Who Can Prepare As-Built Drawings in Dubai?

As-built drawings used for authority or developer submissions should be prepared by an engineering consultancy that can survey the property, draft to the required format and review the drawings for submission.

We get your drawings for you

No need to chase the developer or the authority yourself. Send us your title deed, Emirates ID or passport and a signed authorisation letter: we request your approved drawings, or survey the property and prepare new as-built drawings. You receive PDF, and CAD where available.

How to get your property drawings →Request online →WhatsApp us
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa

Streamlined

Approval process

End-to-end

NOC to permit, managed

Direct access

To your project team

Always on

Client support

Why It Matters

Drawings submitted to DM, DDA, Trakhees or developers need to be accurate and in the right format. A consultancy can also assess structural elements and stamp the drawings where required.

How We Prepare Your Drawings

01

Site Visit & Measured Survey

02

Existing Documents Reviewed

03

AutoCAD Drafting

04

Engineer Review

05

Stamped Drawings Issued

06

Submission Support

How Our Approval Process Works

Our expert engineers handle the entire NOC process, ensuring faster approvals and full compliance with Dubai regulations.

What to Look For

On-site surveying, AutoCAD drafting to the authority’s format, engineer review, and experience with the developer or authority you are submitting to.

Situations We Help With

Villa Owners

Buyers & Sellers

Contractors

Building Management

Warehouse Owners

Tenants

Who Can Prepare As-Built Drawings in Dubai? at a Glance

StepWhoWhat happens
1Structural engineerSurveys the site and prepares drawings to the format of the developer and the authority.
2Master developer (where the community has one)Issues the community NOC against its design guidelines.
3Building authority — Dubai Municipality, DDA or Trakhees — depending on the communityBuilding permit; work starts only after it is issued.
4Developer and authorityCompletion inspection and sign-off.

Documents Required

  • Title deed (or tenancy contract plus landlord NOC for tenants)
  • Owner passport and Emirates ID copy
  • Affection plan / site plan
  • Any existing drawings (PDF or CAD)
  • Access to the site for the survey

Key Technical Rules

  • Survey-based: drawings are prepared from our own site survey, not traced from old PDFs.
  • Authority format: prepared to the submission format of DM, DDA or Trakhees as required.
  • DLTM where required: developers and authorities ask for AutoCAD in DLTM coordinates for works near or outside the plot limit.
  • Existing and proposed: both sets are shown so reviewers can see the change.
  • PDF and DWG: issued in both formats for submission.
Villa Drawings for Dubai Structural Calculations for Villa Modifications in Dubai Nakheel online services

Site Survey

Our own team

Authority Format

DM, DDA, Trakhees

PDF + DWG

Ready to submit

Why Owners Choose Structural Solutions for Drawings

Measured On Site

Our team surveys the property in person, so the drawings show what is actually built.

Authority-Ready Formats

Drawings prepared in AutoCAD to the format the reviewing authority or developer expects — DM, DDA, Trakhees or developer requirements.

Engineer Reviewed & Stamped

Every set is reviewed by our engineers and can be stamped for submission.

Get Your Drawings Prepared

Tell us about your property and what the drawings are for — we will survey, draft and deliver drawings ready for submission.

Who Can Prepare As-Built Drawings in Dubai? — FAQs

Who can prepare as-built drawings in Dubai?

For submissions, an engineering consultancy that can survey, draft to format and review the drawings.

Can a draughtsman prepare them?

For submissions, drawings usually need consultant review.

Do drawings need a stamp?

Many submissions require a consultant stamp.

Do you prepare them?

Yes.

Do you cover all authorities?

DM, DDA, Trakhees and developer submissions.