DIEZ · Question

What Is a DIEZ Permit?

A DIEZ permit is the fit-out or building permit from the DSO Authority for works in Dubai Silicon Oasis.

The short answer

A DIEZ permit is the approval from the DSO Authority, part of DIEZ, for works in Dubai Silicon Oasis. Fit-out permits cover interior works such as offices, shops, restaurants and clinics; building permits cover new works and major changes. Both come after the building management or landlord NOC and are followed by Civil Defence approval and completion.

Issued byDSO Authority (DIEZ)
TypesFit-out and building permits
AlsoCivil Defence

What you need to know

  • Fit-out permit: Interior works in a unit.
  • Building permit: New works and major changes.
  • Structure: Calculations where the works need them.

Documents you will need

  • Lease or title deed, and trade licence for businesses
  • Building management or landlord NOC
  • Existing or as-built drawings of the unit
  • Proposed fit-out or modification drawings, stamped by the consultant
  • Fire safety drawings for Civil Defence
  • Structural calculations where the works need them

By type of unit

DIEZ approvals by type of unit

We confirm the route for your unit.

UnitApproval routeGuides
Office
Building NOC, DSO Authority, DCD
Layout and fire safety.DSO fit-out
Shop or showroom
Building NOC, DSO Authority, DCD
Layout and signage.Shops
Restaurant or café
Plus DM Food Safety
Kitchen layout; LPG provider approval or electric undertaking.Restaurants
Clinic
Plus DHA
Health facility approval.Clinics
Warehouse
Building NOC, DSO Authority, DCD
Mezzanine and racking checked.Mezzanine and racking
Villa (Cedre Villas)
Through an approved consultant
To the DSO Authority.DSO building permit

How it works

How we get your DIEZ permit

1. Review

The unit, the works and the drawings you have.

2. Building NOC

From building management or the landlord.

3. Drawings

Fit-out or modification drawings, and calculations if needed.

4. DSO Authority (DIEZ)

Fit-out or building permit.

5. Civil Defence

Fire safety approval.

6. Inspection

Inspection and completion.

Who does what

Who approves works in Dubai Silicon Oasis

🏢

Building management or landlord

Their NOC comes first. There is no developer NOC in Dubai Silicon Oasis.

Building NOC →
🏛️

DSO Authority (DIEZ)

The Dubai Silicon Oasis Authority, part of DIEZ, issues the fit-out and building permits.

What is DIEZ? →
🚒

Dubai Civil Defence

Approves the fire safety drawings and inspects before completion.

DCD and DIEZ →
📐

Structural Solutions

As the consultant, prepares the drawings and calculations and submits to the DSO Authority.

DSO approval services →

Why DIEZ submissions get returned

  • Building management or landlord NOC missing
  • Drawings that do not match the unit
  • Fire safety changes without DCD approval
  • Structural changes without calculations
  • Works started before the permit

Questions

Questions owners and tenants ask

What is a DIEZ permit?

The DSO Authority permit for works in Dubai Silicon Oasis.

Does DIEZ issue building permits in DSO?

Yes, through the DSO Authority.

Is Civil Defence still needed?

Yes.

Related guides

Keep reading