As-Built Drawings for a Wall Opening in Dubai
No drawings of your villa or apartment? The structural check starts here.
A wall opening design needs to know what the wall is and what is above it. If you do not have the as-built drawings, we obtain them from the developer or building management where available, or our engineers survey the property and redraw it in PDF and CAD. The drawings are then used for the structural design and the approvals.

Official sources: Dubai Municipality, Dubai Development Authority (DDA)
What we check first
- Wall: Load-bearing or partition
- Structure: Slab, beams, columns above
- Material: Block, concrete or precast
- Opening: Width and position
- Records: As-built drawings or survey
- Route: Developer or BM, then authority
Documents you will need
- Photos of the wall from both sides, and the ceiling above
- Villa or unit number and community or building
- As-built drawings, if you have them
- Title deed and owner ID
Route
How a wall change is approved
The structural check comes first. The NOC and permit follow the area and the property type.
| Step | Approval route | Guides |
|---|---|---|
| Structural check Our engineers | As-built drawings, or a site survey, to confirm whether the wall carries load. | Is my wall load-bearing? |
| Design Structural Solutions | Beam or lintel design, stamped structural calculations and drawings. | Do I need calculations? |
| NOC Developer or building management | Villas in a community: developer NOC. Apartments and offices: building management NOC. | — |
| Permit The authority for the area | DM, DDA, Trakhees or the area authority, for the structural works. | Wall opening permit |
| Works Your contractor | To the approved drawings, with temporary propping where needed. | — |
| Completion Authority and developer | Inspection and completion of the works. | Wall opening sign-off |
How it works
How it works
1. Send photos
The wall, the ceiling and what you want.
2. Records
As-built drawings, or a survey.
3. Structural check
Load-bearing or not, and what is above.
4. Design
Beam or lintel, stamped calculations.
5. NOC and permit
Developer or BM, then the authority.
6. Works and completion
Propping, works, inspection.
Related wall questions
What causes problems
- Removing or opening a wall before the check
- Drawings that do not match the existing structure
- Starting works before the NOC and permit
Planning a wall change?
Check the wall first
Send us three things on WhatsApp:
- Photos of the wall and the ceiling above
- Your community or building, and unit number
- What you want to open or remove
Our engineers check whether the wall carries load, design the beam or support and handle the NOC and the permit.
Questions
Questions
Where are my as-built drawings?
In your handover documents, or with the developer or building management.
Can you survey and redraw?
Yes, in PDF and CAD.
Do the drawings need to be updated after the works?
The final drawings show the new opening.
Do you cover all of Dubai?
Yes.
How do I contact you?
Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.