Walls · Structural · Approvals

Open-Plan Ground Floor in Dubai: Removing Walls Between Living Spaces

Joining the living, dining and kitchen spaces? Here is what to check first.

An open-plan ground floor usually means opening or removing more than one wall, and at least one of them often carries the floor above. Our engineers check each wall, design the beams or frames needed, and prepare stamped calculations for the developer NOC and the authority permit, so the whole layout is approved in one application.

What we check first

  • Wall: Load-bearing or partition
  • Structure: Slab, beams, columns above
  • Material: Block, concrete or precast
  • Opening: Width and position
  • Records: As-built drawings or survey
  • Route: Developer or BM, then authority

Documents you will need

  • Photos of the wall from both sides, and the ceiling above
  • Villa or unit number and community or building
  • As-built drawings, if you have them
  • Title deed and owner ID

Route

How a wall change is approved

The structural check comes first. The NOC and permit follow the area and the property type.

StepApproval routeGuides
Structural check
Our engineers
As-built drawings, or a site survey, to confirm whether the wall carries load.Is my wall load-bearing?
Design
Structural Solutions
Beam or lintel design, stamped structural calculations and drawings.Do I need calculations?
NOC
Developer or building management
Villas in a community: developer NOC. Apartments and offices: building management NOC.—
Permit
The authority for the area
DM, DDA, Trakhees or the area authority, for the structural works.Wall opening permit
Works
Your contractor
To the approved drawings, with temporary propping where needed.—
Completion
Authority and developer
Inspection and completion of the works.Wall opening sign-off

How it works

How it works

1. Send photos

The wall, the ceiling and what you want.

2. Records

As-built drawings, or a survey.

3. Structural check

Load-bearing or not, and what is above.

4. Design

Beam or lintel, stamped calculations.

5. NOC and permit

Developer or BM, then the authority.

6. Works and completion

Propping, works, inspection.

What causes problems

  • Removing or opening a wall before the check
  • Drawings that do not match the existing structure
  • Starting works before the NOC and permit

Planning a wall change?

Check the wall first

Send us three things on WhatsApp:

  1. Photos of the wall and the ceiling above
  2. Your community or building, and unit number
  3. What you want to open or remove

Our engineers check whether the wall carries load, design the beam or support and handle the NOC and the permit.

Questions

Questions

Can I remove all the walls on the ground floor?

Not always. Some carry the first floor; beams or columns may be needed.

Is one application enough for several walls?

Yes, the whole layout goes in one set of drawings.

Will I need new columns?

Sometimes. The design shows it.

Can you design for a clear span?

Where the structure allows, yes.

How do I contact you?

Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.

Related guides

Keep reading