Value engineering · Steel structures · Dubai

Value Engineering for Contractors in Dubai

For contractors who want a buildable, compliant steel design.

Contractors use value engineering to make a steel design easier to fabricate and erect, and to align it with the materials and sections they can source, without losing compliance. Our engineers review the consultant design, propose alternatives and prepare the revised drawings and calculations for approval.

What we check first

  • Structure: Steel frame, purlins, bracing
  • Loads: Wind, roof, crane, mezzanine
  • Code: Design code and authority
  • Connections: Bolts, plates, base plates
  • Foundations: Reactions and footings
  • Approval: Revision if already approved

Documents you will need

  • Current structural drawings and calculations
  • Architectural layout and building use
  • Location and authority (DM, DDA, Trakhees or free zone)
  • Steel tonnage or bill of quantities, if available

Route

How it works, step by step

Each project is reviewed first; the route follows the property and the authority.

StepApproval routeGuides
Review
Our engineers
The drawings, calculations and the tonnage of the current design.—
Options
Structural Solutions
Alternative frames, sections and connections that meet the code.—
Redesign
Structural Solutions
Updated drawings and stamped calculations.—
Approval
Authority for the area
A revised submission where the design was already approved.Re-approval
Fabrication
Your steel contractor
Shop drawings to the approved design.—
Site
Contractor
Erection to the approved drawings.—

How it works

How it works

1. Send the design

Drawings, calculations, building type.

2. Review

Our engineers check the steel.

3. Options

Where the design can be optimised.

4. Redesign

Drawings and stamped calculations.

5. Approval

Revision where needed.

6. Fabrication

Your contractor builds to it.

Steel project in Dubai?

Send us the design

Send us three things on WhatsApp:

  1. Structural drawings or calculations
  2. Building type and location
  3. Stage: design, tender or approved

Our engineers review the steel design and tell you where it can be optimised. Savings depend on the project.

Questions

Questions

Can a contractor ask for value engineering?

Yes, with the owner’s agreement for any design change.

Will the original consultant need to agree?

Changes to their design are coordinated with the consultant of record.

Do you prepare shop drawings?

We review and coordinate them with the design.

Is a revised approval needed?

Usually, if the design was approved.

How do I contact you?

Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.

Related guides

Keep reading