Value engineering · Steel structures · Dubai

Value Engineering for Pre-Engineered Steel Buildings in Dubai

Pre-engineered buildings come with a supplier design. We review it.

Pre-engineered steel buildings are designed by the supplier. An independent review checks the loads, the frame, the connections and the foundation reactions against the code and the authority requirements, and compares options. Our engineers review the supplier design and advise before you commit.

What we check first

  • Structure: Steel frame, purlins, bracing
  • Loads: Wind, roof, crane, mezzanine
  • Code: Design code and authority
  • Connections: Bolts, plates, base plates
  • Foundations: Reactions and footings
  • Approval: Revision if already approved

Documents you will need

  • Current structural drawings and calculations
  • Architectural layout and building use
  • Location and authority (DM, DDA, Trakhees or free zone)
  • Steel tonnage or bill of quantities, if available

Route

How it works, step by step

Each project is reviewed first; the route follows the property and the authority.

StepApproval routeGuides
Review
Our engineers
The drawings, calculations and the tonnage of the current design.—
Options
Structural Solutions
Alternative frames, sections and connections that meet the code.—
Redesign
Structural Solutions
Updated drawings and stamped calculations.—
Approval
Authority for the area
A revised submission where the design was already approved.Re-approval
Fabrication
Your steel contractor
Shop drawings to the approved design.—
Site
Contractor
Erection to the approved drawings.—

How it works

How it works

1. Send the design

Drawings, calculations, building type.

2. Review

Our engineers check the steel.

3. Options

Where the design can be optimised.

4. Redesign

Drawings and stamped calculations.

5. Approval

Revision where needed.

6. Fabrication

Your contractor builds to it.

Steel project in Dubai?

Send us the design

Send us three things on WhatsApp:

  1. Structural drawings or calculations
  2. Building type and location
  3. Stage: design, tender or approved

Our engineers review the steel design and tell you where it can be optimised. Savings depend on the project.

Questions

Questions

Can you review a supplier design?

Yes, the drawings and calculations.

Do you design the foundations for a PEB?

Yes, from the supplier reactions.

Is approval still needed?

Yes, the building needs the authority permit.

Can you compare two supplier offers?

Yes, on the structural design.

How do I contact you?

Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.

Related guides

Keep reading