JAFZA · Trakhees

JAFZA Warehouse Structural Assessment

We carry out structural assessments of warehouses in JAFZA — for new loads, change of use, damage, regularisation or insurance — and prepare a stamped report.

When It Is Needed

Before adding racking, mezzanines, cranes or solar; before a change of use; after damage; or when the landlord, insurer or Trakhees asks.

Free-Zone NOCFirst approval
Load CheckSlab, roof, racking
Civil DefenceFire and life safety

What you need to know

  • The Report: Site inspection, checks of the critical members and a stamped report with any strengthening needed.
  • Free-zone or developer NOC: JAFZA, DIP, Dubai South and other zones approve works first.
  • Authority permit: from the authority for the zone.
  • Civil Defence: fire and life safety approval for the activity.
  • Slab and roof loads: racking, mezzanines and cranes are checked against the structure.
  • Completion inspection: before operation.

Documents you will need

  • Trade licence
  • Lease agreement
  • Master developer or free-zone NOC
  • Layout, racking and equipment details
  • Proposed drawings and stamped structural calculations

At a glance

JAFZA Warehouse Structural Assessment at a glance

Who does what, step by step.

WhoApproval routeGuides
Structural engineer
Step 1
Designs structural changes, mezzanines and racking supports and prepares stamped drawings and calculations.—
Master developer or free zone
Step 2
Issues the NOC for the works.—
Authority — Trakhees
Step 3
Reviews the drawings and issues the permit.—
Civil Defence (DCD)
Step 4
Fire and life safety approval where required.—
Landlord and authority
Step 5
Completion inspection.—

How it works

How We Deliver Industrial Structural Approvals

Site Visit & Existing Drawings

Structural Assessment

Design & Stamped Calculations

Landlord / Zone NOC

Authority Approval

Installation & Sign-Off

Who does what

Who does what in JAFZA

🏭

JAFZA

Free zone authority. Its NOC comes first for works in a JAFZA plot or unit.

JAFZA approvals →
🏛️

Trakhees

Civil Engineering Department (CED): building permit for structural works and inspection at completion.

Trakhees approval →
📐

Structural Solutions

Prepares the drawings and stamped calculations and submits for you as the approved consultant.

Talk to our engineers →

Industrial Works We Handle

  • Change of Use
  • New Loads
  • Damage
  • Regularisation
  • Insurance
  • Purchase or Lease

Why applications come back

  • Drawings not in the format Trakhees asks for
  • No stamped structural calculations
  • Works started before the permit
  • Missing landlord NOC or licence documents
  • Fire safety items not shown

Questions

Questions owners ask

When do I need a warehouse structural assessment in JAFZA?

Before new loads or a change of use, after damage, or when requested.

Who stamps industrial structural calculations?

An authority-registered structural consultant — for Trakhees, DM, DDA or Dubai South Authority depending on the location.

Do you check the existing structure?

Yes — slabs, columns, roofs and foundations are checked before new loads are added.

Can unapproved structures be regularised?

Often yes, with an assessment, calculations and a retrospective approval.

Is Civil Defence involved?

Often — fire and life safety approval is needed for many industrial activities.