Our Projects: Real Structural and Approval Cases in Dubai
These structural projects in Dubai show the kind of problem we are asked to solve: what the owner wanted, what limited it, and which approvals applied. Clients are kept private, and every villa is studied on its own.
What these structural projects in Dubai show
We review structures, prepare stamped drawings and calculations, and handle the developer NOC, the authority permit and completion. The right answer depends on the villa, so we share the situation and the route, not a standard solution.

Official sources: Dubai Municipality · Trakhees
What we do on a project
- Review: Existing structure and any earlier design
- Design: Stamped drawings and calculations
- Developer: The NOC from the master developer
- Authority: DM, DDA or Trakhees, by area
- Site: Inspections during and after the works
- Close-out: The completion certificate
Documents you will need
- Photos of the area
- Villa or unit number
- Any existing drawings or calculations
- What you want to change
How it works
How a project starts
1. Your message
Send photos and what you want to do.
2. Route
We confirm the developer and the authority.
3. Site check
We review the existing structure.
4. Options
We tell you what is possible and propose a design.
5. Approvals
Drawings, calculations and submissions.
6. Completion
Inspections and the certificate.
Common questions from these cases
What we often see
- Works started before the design was checked
- A column or wall removed without a review
- Loads from an extension not considered
- A mezzanine not treated as added GFA
- Older changes that were never approved
Real cases
Structural projects in Dubai we have worked on
Clients and villa numbers are kept private.
The Lakes · Emaar and Dubai Municipality
A column removed, then rebuilt
The situation: during a first-floor extension, a contractor removed a middle column, then rebuilt it because the new loads needed it. The owner still wanted an open room.
The limit: about 30 cm between the existing slab and the false ceiling.
What we did: reviewed the contractor’s assessment and proposed an alternative structural system that keeps the open layout.
Jumeirah Golf Estates · wasl and Trakhees
A mezzanine and an accessibility lift
The situation: a villa owner wanted a mezzanine inside a double-height space, and a lift for accessibility.
What mattered: the mezzanine counts as added GFA, the lift must stay inside the building envelope, and accessibility concessions can be requested case by case.
The route: wasl Urban Management (JGE NOC / DRC), then the Trakhees permit.
Mudon · DDA
Load-bearing walls removed before approval
The situation: we were invited to a villa and found that the contractor had removed load-bearing walls on the ground floor before any approvals, and before installing any supports.
Why it matters: load-bearing walls carry the floor and roof above. Removing them without temporary supports puts the structure, and the people inside, at risk. Works done without approval also need the as-built route.
What we did: assessed the villa, checked its current condition, ran the needed tests and proposed the needed supports first, all set out in the report we issued.
Have a similar case?
Tell us about it
Send us three things on WhatsApp:
- Your community
- Photos of the area
- What you want to change
We review it and tell you what is possible.
Questions
Project questions
Are these real projects?
Yes. They are real cases, with client details kept private.
Why don’t you show the exact solution?
Each villa is different, so we study the actual structure before proposing one. What suits one villa may not suit another.
Can you help if works have already started?
Yes. We can review the design during construction and propose changes before the works go further.
Do you only work on villas?
No. We also work on apartments and commercial spaces.
Can I get the same result in my villa?
It depends on your structure, loads and community. Send us the details and we will review them.
What should I do if my contractor removed a wall without approval?
Stop the works and contact us. An engineer needs to check the structure, and works done without approval go through the as-built route.
Related guides