My Arabian Ranches Renovation Was Stopped. What Now?
If your Arabian Ranches renovation was stopped, find out who stopped it and why, then survey the works and get them approved before restarting.
The short answer
Stop work and find out who stopped it, Emaar or DDA, and the reason. It is usually works without an NOC or permit, or works that differ from the approved drawings. We survey what has been built and compare it with Emaar’s guide and the approved drawings. Then we prepare the drawings and calculations for approval, or advise what must change if the guide does not allow it, such as a garage room.
Official sites: Emaar · Dubai Development Authority (DDA)
What you need to know
- Keep the notice: We need the reason given.
- Contractor: Entry permits may also be affected.
- Works outside the guide: May need changing, not only paperwork.
Documents you will need
- Title deed and owner ID
- Architectural drawings and elevations, existing and proposed
- Detailed scope of works
- Photos of the villa
- Contractor or consultant licence
- Coloured 3D concept
- Affection plan (independent villas)
- Building Completion Certificate
How it works
From idea to approval
1. Check
We check your idea against Emaar’s guide and your villa’s plans.
2. Drawings
Drawings and stamped calculations, using the as-built plans Emaar provides.
3. Emaar NOC
We apply for you.
4. DDA permit
The building permit for structural works.
5. Works
Built as approved, with contractor entry permits.
6. Completion
Final inspections and the completion certificate.
Who does what
Who approves works in Arabian Ranches
Dubai Development Authority (DDA)
Issues the building permit for structural works in Arabian Ranches 1, 2 and 3, after the Emaar NOC.
Is Arabian Ranches under DDA? →Structural Solutions
Checks the idea against the guide, prepares drawings and stamped calculations, and handles the NOC and permit.
Arabian Ranches approval guide →Why applications come back
- Design does not follow Emaar’s guide
- Materials or colours do not match the villa
- Drawings or Building Completion Certificate missing
- Works started before the NOC
Questions
Questions owners ask
Who can stop works in Arabian Ranches?
Emaar and DDA.
Can it be approved after the works?
Often yes if it fits the rules; otherwise it needs changing.
What if the contractor had no NOC?
We survey the works and start the approvals.
Can you deal with Emaar and DDA?
Yes.