Warehouses, offices and showrooms in JAFZA need signage approval through the free zone’s authority (Trakhees), after landlord approval. Large or rooftop signs need engineer-stamped calculations.

How Signage Is Approved Here

The route is: landlord, mall or developer NOC, then Trakhees. Where the sign is large, on a roof, freestanding or projecting, engineer-stamped structural calculations are added to the submission.

Landlord NOCFirst approval
Wind & FixingsStamped calculations
Signage PermitBefore installation

What you need to know

  • What We Prepare: Sign drawings with dimensions, materials and fixing details, engineer-stamped structural calculations where needed, and the submission documents.
  • NOC first: the landlord, mall or developer approves the sign before the authority permit.
  • Structural calculations: rooftop, pylon and large facade signs need stamped calculations for wind and fixings.
  • Size and position rules: set by the building and the authority for the area.
  • Electrical safety: illuminated signs need safe electrical details.
  • Permit before installation: signs go up only after approval.

Documents you will need

  • Trade licence
  • Tenancy contract or Ejari
  • Landlord, mall or developer NOC
  • Sign design with size, materials and position
  • Photos of the facade or location

At a glance

JAFZA Signage Approval at a glance

Who does what, step by step.

WhoApproval routeGuides
Structural engineer
Step 1
Prepares the sign drawings and, for larger signs, the stamped structural calculations.—
Landlord, mall or master developer
Step 2
Issues the NOC for the works.—
Authority — Trakhees
Step 3
Reviews the drawings and issues the permit.—
Landlord and authority
Step 4
Completion inspection.—

How it works

How We Get Your Signage Approved

Sign Design, Size & Location Reviewed

Landlord, Mall or Developer NOC

Structural Check Where Needed

Engineer-Stamped Drawings & Calculations

Authority Signage Permit

Installation & Inspection

Who does what

Who does what in JAFZA

🏭

JAFZA

Free zone authority. Its NOC comes first for works in a JAFZA plot or unit.

JAFZA approvals →
🏛️

Trakhees

Civil Engineering Department (CED): building permit for structural works and inspection at completion.

Trakhees approval →
📐

Structural Solutions

Prepares the drawings and stamped calculations and submits for you as the approved consultant.

Talk to our engineers →

Projects We Handle

  • Shopfront Sign
  • Office Sign
  • Building Facade Sign
  • Rooftop Sign
  • Pylon or Totem
  • Rebranding

Why applications come back

  • Drawings not in the format Trakhees asks for
  • No stamped structural calculations
  • Works started before the permit
  • Missing landlord NOC or licence documents
  • Fire safety items not shown

Questions

Questions owners ask

Who approves signage here?

Trakhees, after the landlord or developer NOC.

Do I need structural calculations?

For large, rooftop, freestanding or projecting signs, typically yes.

Can I install the sign before approval?

No — install only after the landlord or mall approval and the signage permit are issued.

Do you prepare the sign drawings?

Yes — elevations, materials and fixing details, stamped where required.

Can you work with my sign company?

Yes — we provide structural calculations, stamped drawings and approval support for sign makers.