JAFZA Signage Approval
Warehouses, offices and showrooms in JAFZA need signage approval through the free zone’s authority (Trakhees), after landlord approval. Large or rooftop signs need engineer-stamped calculations.
How Signage Is Approved Here
The route is: landlord, mall or developer NOC, then Trakhees. Where the sign is large, on a roof, freestanding or projecting, engineer-stamped structural calculations are added to the submission.
What you need to know
- What We Prepare: Sign drawings with dimensions, materials and fixing details, engineer-stamped structural calculations where needed, and the submission documents.
- NOC first: the landlord, mall or developer approves the sign before the authority permit.
- Structural calculations: rooftop, pylon and large facade signs need stamped calculations for wind and fixings.
- Size and position rules: set by the building and the authority for the area.
- Electrical safety: illuminated signs need safe electrical details.
- Permit before installation: signs go up only after approval.
Documents you will need
- Trade licence
- Tenancy contract or Ejari
- Landlord, mall or developer NOC
- Sign design with size, materials and position
- Photos of the facade or location
At a glance
JAFZA Signage Approval at a glance
Who does what, step by step.
| Who | Approval route | Guides |
|---|---|---|
| Structural engineer Step 1 | Prepares the sign drawings and, for larger signs, the stamped structural calculations. | — |
| Landlord, mall or master developer Step 2 | Issues the NOC for the works. | — |
| Authority — Trakhees Step 3 | Reviews the drawings and issues the permit. | — |
| Landlord and authority Step 4 | Completion inspection. | — |
How it works
How We Get Your Signage Approved
Sign Design, Size & Location Reviewed
Landlord, Mall or Developer NOC
Structural Check Where Needed
Engineer-Stamped Drawings & Calculations
Authority Signage Permit
Installation & Inspection
Who does what
Who does what in JAFZA
Trakhees
Civil Engineering Department (CED): building permit for structural works and inspection at completion.
Trakhees approval →Structural Solutions
Prepares the drawings and stamped calculations and submits for you as the approved consultant.
Talk to our engineers →Projects We Handle
- Shopfront Sign
- Office Sign
- Building Facade Sign
- Rooftop Sign
- Pylon or Totem
- Rebranding
Why applications come back
- Drawings not in the format Trakhees asks for
- No stamped structural calculations
- Works started before the permit
- Missing landlord NOC or licence documents
- Fire safety items not shown
Questions
Questions owners ask
Who approves signage here?
Trakhees, after the landlord or developer NOC.
Do I need structural calculations?
For large, rooftop, freestanding or projecting signs, typically yes.
Can I install the sign before approval?
No — install only after the landlord or mall approval and the signage permit are issued.
Do you prepare the sign drawings?
Yes — elevations, materials and fixing details, stamped where required.
Can you work with my sign company?
Yes — we provide structural calculations, stamped drawings and approval support for sign makers.