Is the Previous Owner’s Extension Approved in Tilal Al Furjan?
Is the Previous Owner’s Extension Approved in Tilal Al Furjan? Check before you buy or renovate. Unapproved works must be approved or removed before new works or a sale.
The short answer
Many villas in Tilal Al Furjan have extensions or changes from earlier owners. To know whether they are approved, compare the villa with the approved drawings and the Nakheel and Trakhees records. Unapproved changes show up in the Nakheel Villa Status Report (VSR) and need fixing before a sale. If something is not approved, we survey it, prepare drawings and calculations and apply for approval, or advise removal.

What we check first
- Plot and setbacks: where an extension, pergola or pool can go on your plot.
- Structure: walls, slabs, columns and foundations before any opening or new load.
- Existing area: measured from the Nakheel villa plans and on site.
- Unapproved works: older changes that would show in the Nakheel VSR are approved first.
Documents you will need
- Photos of the villa and the area you want to change
- Villa and plot number in Tilal Al Furjan
- Title deed and owner ID
- A sketch or short description of the idea
- Nakheel villa plans, if you have them
Who does what
The approval route in Tilal Al Furjan
Nakheel first, then Trakhees. Tilal Al Furjan is part of the Al Furjan area. We confirm the exact route for your villa.
| Step | Approval route | Guides |
|---|---|---|
| Design Structural Solutions | Site check, drawings and stamped structural calculations, using the villa plans Nakheel provides. | — |
| Nakheel NOC Nakheel | NOC through the Nakheel online portal. Nakheel reviews the design and confirms its fees. | Nakheel extension fees |
| Permit Trakhees | Building permit for structural works and added floor area, submitted by an approved consultant. | — |
| Inspections Nakheel and Trakhees | Inspections during and after the works. | — |
| Completion Trakhees | Completion certificate that closes the permit; Nakheel updates its records. | — |
How it works
How it works in Tilal Al Furjan
Tell us the idea
Villa number, photos and what you want to change.
We check and design
Nakheel villa plans, a site check, drawings and stamped calculations where needed.
We get it approved
Nakheel NOC through the Nakheel online portal, then the Trakhees permit where the works are structural.
Guides for works in Tilal Al Furjan
- What can I change? (start here)
- Can I extend my villa?
- How much bigger can my villa be?
- Add a bedroom
- Room on the roof
- Open up walls inside
- Close my balcony
- Garage conversion
- Maid room in the garden
- Pergola or car shade
- Swimming pool
- Villa lift
- Solar panels
- Previous owner’s extension
- Selling with unapproved changes
What each work needs in Tilal Al Furjan
- Extension: Nakheel NOC, Trakhees permit and stamped calculations
- Wall removal: structural check, Nakheel NOC and Trakhees permit
- Balcony closure: Nakheel NOC and Trakhees permit; it adds floor area
- Pergola or car shade: Nakheel NOC, stamped calculations and a steel contractor stamp for steel
- Pool: Nakheel NOC, Trakhees permit and the DM environmental NOC
- External colour or façade: Nakheel NOC
- Internal finishes only: usually no permit; check with Nakheel first
Questions
Questions owners ask in Tilal Al Furjan
Is the Previous Owner’s Extension Approved in Tilal Al Furjan?
Compare the villa with the approved drawings and records. We check it on site.
What if it is not approved?
It needs a retrospective approval with drawings and calculations, or removal.
Can I start new works before fixing it?
Usually not. Earlier works are approved first.
Does it affect a sale?
Unapproved changes show up in the Nakheel Villa Status Report (VSR) and need fixing before a sale.
Does it use the extension allowance?
An approved earlier extension uses part of it.
Last checked: October 2026. Official sources: Nakheel · Trakhees · Dubai Municipality
Related guides
