Nakheel · Jumeirah Park

Is the Previous Owner's Extension Approved in Jumeirah Park?

Do not assume it is. Jumeirah Park is an established community, and many villas have extensions, enclosed terraces or garden rooms added over the years. The plans from Nakheel show what was approved.

How to Check

Compare the villa with the plans from Nakheel room by room. Anything not on the plans may not be approved.

Nakheel NOCVia the online portal
Villa PlansProvided by Nakheel
Trakhees PermitFor structural works

What you need to know

  • If It Is Not Approved: It may need regularising with Nakheel and Trakhees before your own works can be approved.
  • Villa plans: Nakheel provides villa plans to owners; if they are missing, the villa is surveyed and drawn as built.
  • Approved consultant: Submissions to Trakhees are made by an approved consultant, not by the owner.
  • VSR: Unapproved works show up in the Villa Status Report (VSR) and need fixing before a sale.

Documents you will need

  • Title deed and owner Emirates ID or passport
  • Villa plans from Nakheel, or as-built drawings
  • Proposed drawings
  • Stamped structural calculations for structural works
  • Photos of the area

At a glance

Is the Previous Owner's Extension Approved in Jumeirah Park? at a glance

Who does what, step by step.

WhoApproval routeGuides
You and our engineers
Step 1
Your idea, photos and plot details. We get the villa plans from Nakheel and check them against what is built.—
Nakheel (online portal)
Step 2
Reviews the design against its community rules and issues the NOC.—
Trakhees
Step 3
Building permit for structural works.—
Nakheel and Trakhees
Step 4
Inspections and completion.—

How it works

How It Works in Jumeirah Park

Your Idea, Photos and Plot Details

Villa Plans From Nakheel

Sketch and Early Check

Drawings and Structural Calculations

Nakheel NOC via the Nakheel online portal

Trakhees Permit, Works and Completion

Who does what

Three parties, one route

🏘️

Nakheel

Master developer of Jumeirah Park. Issues the NOC through its online portal.

Nakheel approvals →
🏛️

Trakhees

Issues the building permit for structural works and inspects at completion.

Trakhees approval →
📐

Structural Solutions

Prepares the drawings and stamped calculations and submits to Nakheel and Trakhees for you.

Talk to our engineers →

What Jumeirah Park Owners Ask Us About

  • Extension
  • Enclosed Terrace
  • Garage Room
  • Pergola
  • Pool
  • Roof Room

Why applications come back

  • Drawings that do not match the villa as it stands
  • AutoCAD in DLTM coordinates not supplied where asked
  • No stamped structural calculations
  • Unapproved works already on the VSR
  • Missing owner documents

Questions

Questions owners ask

How do I know if the extension was approved?

Compare the villa with the plans from Nakheel.

Who approves changes to my Jumeirah Park villa?

Nakheel issues the NOC through the Nakheel online portal, then Trakhees issues the building permit for structural works.

Do I need full drawings to ask if my idea is possible?

No. Photos and a simple sketch are enough for us to give you an early answer.

Can I get the plans of my villa?

Yes. Nakheel can provide the villa plans. Check them against what is built before design starts.

Related guides

Keep reading