Jumeirah Islands Villa As-Built Drawings
We prepare as-built drawings for Jumeirah Islands villas, showing the villa exactly as it stands today. They are needed when original drawings are missing, after past modifications, before new Nakheel NOC or Trakhees applications, and before selling.
Why Jumeirah Islands Owners Need As-Built Drawings
Many Jumeirah Islands villas have been changed since handover — extensions, enclosed areas, removed walls, pools and pergolas. New applications to Nakheel and Trakhees need drawings that match what is actually on site, so the starting point is an accurate as-built set.
What you need to know
- Drawn to Trakhees Requirements: Building permits in Jumeirah Islands are handled by Trakhees, after the Nakheel NOC. We prepare the as-built drawings in AutoCAD to Trakhees CED format, so they can be used directly for the next application.
- Survey-based: drawings are prepared from our own site survey, not traced from old PDFs.
- Authority format: prepared to the submission format of DM, DDA or Trakhees as required.
- DLTM where required: developers and authorities ask for AutoCAD in DLTM coordinates for works near or outside the plot limit.
- Existing and proposed: both sets are shown so reviewers can see the change.
- PDF and DWG: issued in both formats for submission.
Documents you will need
- Title deed (or tenancy contract plus landlord NOC for tenants)
- Owner passport and Emirates ID copy
- Affection plan / site plan
- Any existing drawings (PDF or CAD)
- Access to the site for the survey
At a glance
Jumeirah Islands Villa As-Built Drawings at a glance
Who does what, step by step.
| Who | Approval route | Guides |
|---|---|---|
| Structural engineer Step 1 | Surveys the site and prepares drawings to the format of the developer and the authority. | — |
| Nakheel (master developer) Step 2 | Issues the community NOC against its design guidelines. | — |
| Building authority — Trakhees Step 3 | Building permit; work starts only after it is issued. | — |
| Developer and authority Step 4 | Completion inspection and sign-off. | — |
How it works
How We Prepare Your Drawings
Site Visit & Measured Survey
Existing Documents Reviewed
AutoCAD Drafting
Engineer Review
Stamped Drawings Issued
Submission Support
Who does what
Three parties, one route
Nakheel
Master developer of Jumeirah Islands. Issues the NOC; we apply as your consultant.
Nakheel approvals →Trakhees
Issues the building permit for structural works and inspects at completion.
Trakhees approval →Structural Solutions
Prepares the drawings and stamped calculations and submits to Nakheel and Trakhees for you.
Talk to our engineers →When Jumeirah Islands Owners Call Us
- Original Drawings Missing
- Before a New Extension
- After Unapproved Works
- Before Selling the Villa
- For Regularisation
- For Completion Certificate
Why applications come back
- Drawings that do not match the villa as it stands
- AutoCAD in DLTM coordinates not supplied where asked
- No stamped structural calculations
- Unapproved works already on the VSR
- Missing owner documents
Questions
Questions owners ask
Do I need as-built drawings for my Jumeirah Islands villa?
If the original drawings are missing or the villa has been modified, yes — before new applications or a sale.
Who reviews drawings in Jumeirah Islands?
Nakheel for the NOC, then Trakhees for building permits.
What format are the drawings in?
AutoCAD, prepared to Trakhees CED format.
Do you visit the villa?
Yes, we carry out a measured survey on site.
Can the drawings be used for a new application?
Yes, they are prepared as the base for your next submission.
Related guides
