Is the Previous Owner’s Extension Approved in Dubai Hills?
To find out, compare the villa with its approved plans and ask for the NOC and completion papers. If they are missing, it may be unapproved.
The short answer
Compare what is built with the as-built plans from Emaar, and ask the seller or Emaar for the NOC, permit and completion certificate. If the extension is not on the plans and has no papers, treat it as unapproved until you know more. Unapproved works usually need to be surveyed and approved before Emaar will consider new works. We survey the villa, compare it with the plans, and advise on the route. Some changes, such as a garage room, would have to be reversed.
Official sites: Emaar · Dubai Development Authority (DDA)
What you need to know
- Red flags: A garage room, or a balcony closed without approval.
- Buying: Check this before you commit.
- New works: Earlier works are checked first.
- Paperwork: Keep the NOC, permit and completion certificate.
Documents you will need
- Title deed and owner ID
- Architectural drawings and elevations, existing and proposed
- Detailed scope of works
- Photos of the villa
- Contractor or consultant licence
- Coloured 3D concept
- Affection plan
- Building Completion Certificate
How it works
From idea to approval
1. Check
We check your idea and your villa’s plans.
2. Drawings
Drawings and stamped calculations, using the as-built plans Emaar provides.
3. Emaar NOC
We apply for you.
4. DDA permit
The building permit for structural works.
5. Works
Built as approved, with contractor entry permits.
6. Completion
Final inspections and the completion certificate.
Who does what
Who approves works in Dubai Hills
Dubai Development Authority (DDA)
Issues the building permit for structural works in Dubai Hills Estate, after the Emaar NOC.
Is Dubai Hills under DDA? →Structural Solutions
Checks your idea, prepares drawings and stamped calculations, and handles the NOC and permit.
Dubai Hills approval guide →Why applications come back
- Design does not follow Emaar’s rules
- Materials or colours do not match the villa
- Drawings or Building Completion Certificate missing
- Works started before the NOC
Questions
Questions owners ask
How do I check an old extension?
Compare it with the plans and ask for its approvals.
What if there are no papers?
We survey it and advise on the route.
Will it stop my new NOC?
It can, until it is dealt with.
Does it affect a sale?
It can come up during a sale.
Related guides
