Mall unit · Food layout

Food Layout Approval for a Mall or Food Court Unit

Opening in a mall or food court adds the mall’s own approval.

A food unit in a mall needs the mall management approval of the design first, then the DM Food Safety layout approval, the fit-out permit from the authority for the area and Civil Defence approval. Malls often have their own design and services rules. We prepare drawings that meet the mall’s requirements and the authorities’, and submit them.

What we prepare

  • Mall approval: Design and services
  • Food layout: DM Food Safety
  • Fit-out permit: Area authority
  • DCD: Fire and life safety
  • Exhaust: Mall system
  • Inspection: Before opening

Documents you will need

  • Trade licence or initial approval
  • Tenancy contract or title deed
  • Landlord, building or mall NOC (or we request it with you)
  • Your activity, menu and equipment list
  • Existing drawings, if available

Route

The approval route

The general route. We confirm it for your unit and area.

StepApproval routeGuides
Drawings
Structural Solutions
Food layout drawings: the layout, equipment and how food moves through the unit.Documents and drawings
NOC
Landlord, building or mall
Approval of the works. In communities the developer approves first; in malls, the mall management.—
DM Food Safety
Dubai Municipality
Food layout approval, submitted by us. It applies in DDA, Trakhees, DSO and DMCC areas too.—
Fit-out permit
Authority for the area
DM, DDA, Trakhees, DSO or DMCC, depending on where the unit is.Fit-out permit
Civil Defence
DCD
Fire and life safety approval for the fit-out.DCD for food outlets
Inspection
Dubai Municipality
Inspection before opening. Then the food safety remark on the trade licence is removed.Trade licence remark

How it works

How we get it approved

1. Send us the details

Area, unit, business and what you serve.

2. Site check

We measure the unit and check the services.

3. Drawings

Food layout and fit-out drawings.

4. Submission

DM Food Safety, the area authority and DCD, by us.

5. Comments

We answer them until approval.

6. Inspection

Before opening, then the licence remark is removed.

What causes problems

  • Mall rules not followed in the drawings
  • Exhaust not coordinated with the mall
  • Starting before the mall approves

Opening a food business?

Get your food layout approved

Send us three things on WhatsApp:

  1. Area, building and unit
  2. Your activity and menu
  3. Photos or existing drawings

We prepare the drawings and handle DM Food Safety, the fit-out permit and DCD.

Questions

Questions

Does the mall approve first?

Yes, the mall management approves the design first.

Is DM Food Safety still needed in a mall?

Yes.

Do you work with the mall’s fit-out team?

Yes, we coordinate the drawings with them.

How do I contact you?

Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.

Related guides

Keep reading