Restaurants · Mall stamp · Updated November 2026

Restaurant Fit-Out Stamp for Mall Approval in Dubai

Most Dubai malls ask for restaurant fit-out drawings stamped by a consultant before they approve. We prepare and stamp the structural drawings and calculations, and the architectural and MEP drawings where the mall asks, then handle the authority, Food Safety and DCD approvals that follow.

The mall approves first. Then the authority for the mall (Dubai Municipality or DDA, or Trakhees for Nakheel malls) issues the permit for structural works, DM Food Safety approves the layout and DCD approves the fire safety.

MallStamped drawings first
AuthorityDM, DDA or Trakhees
ThenFood Safety and DCD

By mall

Route after the mall approval

A guide. We confirm your mall first.

MallAuthority
Mall of the EmiratesDubai Municipality
Dubai MallEmaar, then Dubai Municipality
Dubai Hills MallDDA
Nakheel mallsTrakhees
Dubai Outlet MallSee Outlet Mall restaurant

Drawings

What malls usually ask to be stamped

DrawingWhen
Structural drawings and calculationsOpenings, mezzanines, heavy equipment
Architectural layoutMost fit-outs
MEP drawingsKitchen exhaust, drainage, power
As-built drawingsAt handover

Official sites: Dubai Municipality | Dubai Civil Defence | DDA

What you need to know

  • Mall first.
  • Stamp by a consultant.
  • Authority depends on the mall.
  • Food Safety and DCD for every restaurant.

Documents you will need

  • Trade licence
  • Tenancy contract or Ejari
  • Currently approved food layout
  • Photos of the unit and the area
  • Mall fit-out guidelines
  • Contractor drawings if any

How it works

How we handle it

1. Mall rules

Their checklist.

2. Drawings

Prepared or reviewed.

3. Stamp

Drawings and calculations.

4. Mall approval

Submitted.

5. Authority, Food Safety, DCD

In order.

6. Handover

Inspection.

Questions

Questions owners ask

Why does the mall need a consultant stamp?

Malls ask for stamped drawings so a consultant takes responsibility for the design.

Can my fit-out contractor stamp the drawings?

See contractor stamps.

Is mall approval enough?

No. The authority, Food Safety and DCD still approve.

Who can help?

We prepare the drawings and stamped calculations and submit the approvals for you. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.

Related guides

Keep reading