Food layout · Rejected

Why Was My Food Layout Drawing Rejected by Dubai Municipality?

DM Food Safety returned your layout with comments? Here is what usually goes wrong and how it is fixed.

A food layout usually comes back with comments when the drawings are incomplete, do not match the unit or the equipment list, or do not show clearly how food moves through the space. Changes made on site after the drawings were prepared cause the same problem. We read the comments, check the unit, revise the drawings and resubmit.

What we prepare

  • Comments: Read point by point
  • Site: Checked against drawings
  • Drawings: Revised
  • Equipment: List matched
  • Resubmission: By us
  • Follow-up: Until approval

Documents you will need

  • Trade licence or initial approval
  • Tenancy contract or title deed
  • Landlord, building or mall NOC (or we request it with you)
  • Your activity, menu and equipment list
  • Existing drawings, if available

Route

The approval route

The general route. We confirm it for your unit and area.

StepApproval routeGuides
Drawings
Structural Solutions
Food layout drawings: the layout, equipment and how food moves through the unit.Documents and drawings
NOC
Landlord, building or mall
Approval of the works. In communities the developer approves first; in malls, the mall management.—
DM Food Safety
Dubai Municipality
Food layout approval, submitted by us. It applies in DDA, Trakhees, DSO and DMCC areas too.—
Fit-out permit
Authority for the area
DM, DDA, Trakhees, DSO or DMCC, depending on where the unit is.Fit-out permit
Civil Defence
DCD
Fire and life safety approval for the fit-out.DCD for food outlets
Inspection
Dubai Municipality
Inspection before opening. Then the food safety remark on the trade licence is removed.Trade licence remark

How it works

How we get it approved

1. Send us the details

Area, unit, business and what you serve.

2. Site check

We measure the unit and check the services.

3. Drawings

Food layout and fit-out drawings.

4. Submission

DM Food Safety, the area authority and DCD, by us.

5. Comments

We answer them until approval.

6. Inspection

Before opening, then the licence remark is removed.

What causes problems

  • Incomplete drawings
  • Drawings that do not match the unit
  • Equipment list not matching the layout
  • Changes on site after submission

Opening a food business?

Get your food layout approved

Send us three things on WhatsApp:

  1. Area, building and unit
  2. Your activity and menu
  3. Photos or existing drawings

We prepare the drawings and handle DM Food Safety, the fit-out permit and DCD.

Questions

Questions

Can I resubmit?

Yes, with revised drawings that answer the comments.

Do you take over someone else’s submission?

Yes. We review the comments and the drawings.

What if the works are already built?

Works already built take an as-built route: contact us and we help you accordingly. A fine may apply, depending on the case.

How do I contact you?

Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.

Related guides

Keep reading