Floor load · No drawings

Floor Load Check Without the Original Drawings

No structural drawings for your building or unit? A floor load check is still possible. Here is how we get the information we need.

Floor load check without drawings

Our analysis is run from the as-built drawings. If you do not have them, we obtain the existing drawings, or survey the area and redraw it, and then run the structural analysis. You receive the same full report with detailed analysis.

Analysis needsAs-built drawings
If missingWe obtain them or survey and redraw
You receiveA full report

How we get the information

  • Existing drawings: We obtain them
  • Survey: We survey and redraw
  • Analysis: From the as-built drawings

Documents you will need

  • Building and unit details
  • Any drawings you have
  • Item datasheet

How it works

How it works

1. Item details

Weight, footprint and datasheet.

2. As-built drawings

We obtain or review them.

3. Analysis

Slab capacity against the added load.

4. Load spreading

Steel base or spreader plate and anchoring, if needed.

5. Route and lift

Delivery path and lift capacity.

6. Full report

Detailed analysis for review.

As-built guides

Mistakes to avoid

  • Guessing the slab capacity
  • Using drawings from another floor or building
  • Delivering before the check

Need a floor load check?

Check the floor before delivery

Send us three things on WhatsApp:

  1. The item, its weight and footprint (datasheet)
  2. The area, the floor and where the item will sit
  3. As-built drawings, if you have them

We run the analysis from the as-built drawings, design the spreader plate and anchoring if needed, check the route and the lift, and send you the full report.

Questions

No drawings questions

Can a safe be installed without original drawings?

Yes. We obtain the existing drawings, or survey and redraw, then run the analysis.

Is the report different?

No, you receive the same full report with detailed analysis.

How do I contact you?

Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.

Related guides

Keep reading