Dubai Hills Plot Access Permit: Driveway, Gate and Kerb Cut Approval
A new driveway, second access, wider gate or kerb cut for a villa in Dubai Hills Estate needs approval before any work at the road edge: Emaar NOC, then the RTA access steps.
The short answer
Dubai Hills Estate is an Emaar community under DDA. A new driveway, second access, wider gate or kerb cut needs the Emaar NOC and then the RTA access steps: the access design study, the RTA construction NOC and the sidewalk modification permit, based on a site survey and access drawings in DLTM coordinates. The works are done as approved and the security deposit is refunded after they are accepted.
What you need to know
- Survey: The frontage, kerb, poles and levels.
- DLTM drawings: Access layout, kerb cut and interlock.
- Light poles: Moved only with RTA approval.
- Deposit: Refunded after the works are accepted.
Documents you will need
- Title deed and owner ID
- Affection plan
- Site survey of the plot frontage
- Access drawings in PDF and AutoCAD DLTM coordinates
- Developer NOC where the community has a master developer
By community
Plot access route by community
We confirm the route for your plot.
| Community | Approval route | Guides |
|---|---|---|
| Al Barsha, Umm Suqeim Dubai Municipality area | No developer NOC; RTA steps. | Al Barsha and Umm Suqeim |
| Dubai Hills Estate Emaar NOC, DDA | Then the RTA steps. | Dubai Hills |
| Emirates Hills Emaar NOC, DM | Then the RTA steps. | Emirates Hills |
| Palm Jumeirah, JVC, Jumeirah Park Nakheel plot access NOC | After the RTA access design study. | Palm Jumeirah JVC |
| Al Thanyah Fifth Nakheel plot access NOC | Then the RTA steps. | Al Thanyah Fifth |
How it works
The plot access approval chain
1. Site survey
The frontage, kerb, footpath, poles and levels.
2. DLTM drawings
Access layout, kerb cut, interlock and levels in DLTM coordinates.
3. RTA access design study
The concept for the access.
4. Developer NOC
Plot access NOC where there is a master developer.
5. RTA construction NOC
For the works at the road edge.
6. Sidewalk modification permit
Kerb, footpath and interlock changes.
7. Works and deposit
Works done as approved, then the security deposit refund.
Who does what
Who approves a plot access
RTA
Access design study, construction NOC and sidewalk modification permit for the works at the road edge.
RTA driveway NOC →Master developer (where applicable)
Plot access NOC in master communities, e.g. Nakheel or Emaar.
Developer NOC first →Why plot access applications get returned
- Drawings not in DLTM coordinates
- No access design study
- Access too close to a junction, pole or another access
- Works started before the permits
- Site levels or kerb not matching the drawings
Questions
Questions villa owners ask
Do I need approval for a new driveway in Dubai Hills Estate?
Yes: Emaar NOC, then the RTA access steps.
Can a light pole in the way be moved?
Often, with an RTA relocation approval.
Who is the developer in Dubai Hills?
Emaar; the authority is DDA.
Related guides
