DSO Light Industrial Unit Approval: Machinery, Floor Loads and Power
Setting up machinery or a workshop in a Dubai Silicon Oasis light industrial unit needs the landlord NOC, the DSO Authority (DIEZ) permit, Civil Defence and a floor load check.
The short answer
A light industrial unit in Dubai Silicon Oasis is fitted out through the landlord or building management NOC, the DSO Authority permit and Civil Defence approval. Machinery, workbenches and heavy stock are checked against the floor slab with stamped calculations, and equipment bases or anchors are designed where needed. Extra electrical load goes to DEWA. Fire safety is reviewed for the activity and the storage.
What you need to know
- Machinery: Weight and vibration checked against the slab.
- Equipment bases: Designed with stamped calculations where needed.
- Power: Higher load approved by DEWA.
- Workshop layout: Exits, ventilation and fire safety on the drawings.
- Mezzanine or racking: Separate structural design.
Documents you will need
- Lease or title deed, and trade licence for businesses
- Building management or landlord NOC
- Existing or as-built drawings of the unit
- Proposed fit-out drawings, stamped by the consultant
- Fire safety drawings for Civil Defence
- Structural calculations where loads or openings change
By type of unit
Industrial works and what they need
We confirm the route for your unit.
| Work | Approval route | Guides |
|---|---|---|
| Heavy machinery Floor load check | Stamped calculations. | Calculations |
| More power DEWA approval | With the load details. | DEWA load |
| Mezzanine or racking Structural design | Plus DCD. | Mezzanines |
| Storage only Warehouse route | Racking and fire safety. | Warehouses |
How it works
How we get your DSO approval
1. Review
The unit, the planned works and the drawings you have.
2. Drawings
Existing drawings, or we survey and redraw the unit.
3. Building NOC
From building management or the landlord.
4. DSO Authority
Fit-out or building permit, part of DIEZ.
5. Civil Defence
Fire safety drawings approved.
6. Works
Carried out to the approved drawings.
7. Completion
Inspection and completion before the unit opens.
Who does what
Who approves it in Dubai Silicon Oasis
Building management or landlord
Issues the NOC for the works in your unit. There is no developer NOC in DSO.
Building NOC →DSO Authority (DIEZ)
Issues the fit-out or building permit for works in Dubai Silicon Oasis.
DIEZ approval →Dubai Civil Defence
Approves the fire safety for every commercial fit-out change and inspects before completion.
DSO and DCD →Structural Solutions
Prepares the drawings and calculations and handles the submissions as consultant.
Talk to our engineers →What we prepare
Why DSO submissions get returned
- Building management or landlord NOC missing
- Drawings that do not match the unit on site
- Fire safety changes not shown for Civil Defence
- Structural changes without stamped calculations
- Works started before the permit
Questions
Questions tenants and owners ask
Who approves a light industrial unit in DSO?
The DSO Authority (DIEZ) after the landlord NOC, with Civil Defence.
Can the floor take my machinery?
It is checked with stamped calculations before the machines are installed.
Do I need DEWA approval for more power?
Yes, with the load details.
Can I add a mezzanine?
With a structural design and approval.