DSO Change of Use Approval: Office to Clinic, Shop, Gym or Restaurant
Changing what a Dubai Silicon Oasis unit is used for needs the building NOC, the DSO Authority (DIEZ) permit for the new use, Civil Defence and, where loads change, a structural assessment.
A change of use in Dubai Silicon Oasis, for example an office into a clinic, a shop into a cafe or a unit into a gym, is approved through the building management or landlord NOC, the DSO Authority permit for the new use, and Civil Defence for the new occupancy and fire safety. If the new use adds load, such as equipment, storage or a kitchen, a structural assessment checks the floor. Some uses add their own approvals: DHA for clinics and DM Food Safety for restaurants and cafes.
What you need to know
- Building first: The landlord or building management must accept the new use.
- New occupancy: More people or a new activity changes the fire safety.
- Structural assessment: Checks the floor for the new loads.
- Clinics: DHA approval as well.
- Restaurants and cafes: DM Food Safety layout approval as well.
Documents you will need
- Lease or title deed, and trade licence for businesses
- Building management or landlord NOC
- Existing or as-built drawings of the unit
- Proposed fit-out drawings, stamped by the consultant
- Fire safety drawings for Civil Defence
- Structural calculations where loads or openings change
By type of unit
Common changes of use in DSO
We confirm the route for your unit.
| From and to | Approval route | Guides |
|---|---|---|
| Office to clinic Plus DHA | Health facility. | Clinics |
| Shop or office to cafe Plus DM Food Safety | Kitchen layout and LPG. | Restaurants |
| Unit to gym Plus a floor check | Weights and equipment. | Gyms |
| Office to training centre DCD for occupancy | Exits for groups. | Training centres |
| Unit to storage Racking and loads | Calculations. | Warehouses |
How it works
How we get your DSO approval
1. Review
The unit, the planned works and the drawings you have.
2. Drawings
Existing drawings, or we survey and redraw the unit.
3. Building NOC
From building management or the landlord.
4. DSO Authority
Fit-out or building permit, part of DIEZ.
5. Civil Defence
Fire safety drawings approved.
6. Works
Carried out to the approved drawings.
7. Completion
Inspection and completion before the unit opens.
Who does what
Who approves it in Dubai Silicon Oasis
Building management or landlord
Issues the NOC for the works in your unit. There is no developer NOC in DSO.
Building NOC →DSO Authority (DIEZ)
Issues the fit-out or building permit for works in Dubai Silicon Oasis.
DIEZ approval →Dubai Civil Defence
Approves the fire safety for every commercial fit-out change and inspects before completion.
DSO and DCD →Structural Solutions
Prepares the drawings and calculations and handles the submissions as consultant.
Talk to our engineers →What we prepare
Why DSO submissions get returned
- Building management or landlord NOC missing
- Drawings that do not match the unit on site
- Fire safety changes not shown for Civil Defence
- Structural changes without stamped calculations
- Works started before the permit
Questions
Questions tenants and owners ask
Who approves a change of use in DSO?
The DSO Authority (DIEZ) after the building NOC, with Civil Defence.
Can I change an office into a clinic in DSO?
Often yes, with the DSO Authority permit, Civil Defence and DHA.
Do I need a structural assessment?
When the new use adds load, yes.
Does the landlord need to agree?
Yes, the building or landlord NOC comes first.