Does a Warehouse Mezzanine Count as Extra Floor Area (GFA)?
Yes. A mezzanine in a warehouse, shop or office counts as added floor area, as it does in a villa.
The short answer
Yes. A warehouse mezzanine counts as added gross floor area (GFA), and so does a mezzanine in a shop, office or villa. The added area is shown on the drawings submitted for the permit, and the approval is based on it, with Dubai Civil Defence approving the fire safety for the extra area.
What you need to know
- Drawings: The added area is shown.
- Permit: Based on the added area.
- Fire safety: DCD checks the extra area.
Documents you will need
- Trade licence and tenancy contract, or title deed for owners
- Landlord, building management or master developer NOC
- Existing or as-built drawings of the unit or villa
- Mezzanine drawings with stamped structural calculations
- Fire safety drawings for Civil Defence
By situation
By building
We confirm the route for your building and area.
How it works
How we get your mezzanine approved
1. Site and slab review
The unit, the existing slab and columns, and what the mezzanine is for.
2. Existing drawings
From the landlord, developer or authority; if missing or out of date, we survey and draw as built.
3. Design and calculations
Mezzanine drawings, steel design and stamped structural calculations, with the added floor area shown.
4. NOC
Landlord, building management or master developer NOC.
5. Permit and Civil Defence
The authority for the area approves the structure; the approved steel contractor stamps the steel; DCD approves fire safety.
6. Build, inspect, complete
The mezzanine is built as approved, inspected, and the completion certificate is issued.
Who does what
Who approves a mezzanine
Landlord or developer
Gives the NOC for the mezzanine. It comes first.
Authority for the area
Dubai Municipality, DDA, Trakhees, DSO Authority, Dubai South Authority or DMCC approves the structure with stamped calculations.
Who approves? →Approved steel contractor
A steel mezzanine needs the stamp of an approved steel contractor (also called a steel specialist).
Steel contractor stamp →Dubai Civil Defence
Every mezzanine needs DCD approval for fire safety and escape.
Civil Defence and mezzanines →What we prepare
- Drawings with the added area
- Calculations
Why mezzanine submissions get returned
- Mezzanine built before approval
- No landlord or developer NOC
- Drawings that do not match the unit as built
- Slab and columns not checked for the new loads
- Steel without the approved steel contractor stamp
- Added floor area not shown
- No Civil Defence fire safety drawings
Questions
Questions owners and tenants ask
Does a warehouse mezzanine count as GFA?
Yes.
Does an office mezzanine count as GFA?
Yes.
Does it need Civil Defence?
Yes.