Azizi Approval Services in Dubai
Azizi approval in Dubai starts with the Azizi NOC, then a permit from the authority for the location, for example the Dubai Development Authority (DDA). We prepare the drawings and stamped calculations and handle both.
The short answer
Works such as extensions, pergolas, pools, facade changes and structural changes in an Azizi project start with a developer NOC from Azizi. After the NOC, the building permit comes from the authority for the location, for example the Dubai Development Authority (DDA). We confirm the authority for your project before we apply.
Azizi approval Dubai: what you need to know
- Developer NOC: From Azizi, before the permit
- Authority: Depends on the location, for example DDA
- Calculations: Stamped, for any structural work
- Tenants: Need the landlord's written consent
- Built without approval: Contact us to help you accordingly
- Completion: Inspection and completion certificate
Documents you will need
- Title deed and owner ID
- Affection plan
- Existing drawings (we obtain them or survey)
- Proposed drawings and stamped calculations (we prepare these)
- Landlord consent, if a tenant applies
By project
Azizi approval routes in Dubai
The authority depends on the location. We confirm it for your project.
| Project | Approval route | Guides |
|---|---|---|
| Villas and townhouses Azizi → authority for the location | Azizi NOC, then the permit, for example from DDA. | Villa extensions |
| Apartments Azizi → authority for the location | Azizi NOC, then the permit where one is needed. | Apartment renovation |
How it works
6 steps to your Azizi approval
1. Your idea
Project, property and scope.
2. Authority check
We confirm the authority for your location.
3. Drawings
Existing and proposed drawings, stamped calculations.
4. Azizi NOC
We apply to Azizi.
5. Authority permit
Submitted by an approved consultant.
6. Completion
Inspection and completion certificate.
What owners ask us about
Common reasons for delays
- Missing stamped calculations
- Drawings that do not match the property as built
- Submitted to the wrong authority
- Works started before the permit
Need an Azizi NOC?
Get your route today
Send us three things on WhatsApp:
- Your project and unit or villa number
- Photos of the area
- What you want to build or change
We confirm the authority, prepare the drawings and handle the NOC and permit.
Questions
Azizi approval questions
What is an Azizi approval NOC?
The No Objection Certificate from Azizi for works in its projects. It comes before the authority permit.
Is every Azizi project under DDA?
No. It depends on the location, so we check your project first.
Which authority approves works in Azizi projects?
It depends on the location, for example the Dubai Development Authority (DDA). We confirm the authority for your project before we apply.
Which works need an Azizi NOC?
Extensions, pergolas, pools, boundary walls, facade changes, rooftop structures and structural changes such as removing a load-bearing wall.
Do I apply to Azizi or the authority first?
Azizi first. The authority permit follows the NOC.
Do I need structural calculations?
Yes, for extensions, pergolas, wall removals and any structural work. We prepare and stamp them.
Can a tenant apply for an Azizi NOC?
With the landlord's written consent.
What happens after the works?
The developer and the authority inspect the works, and the order can vary. The authority then issues the completion certificate.
What if the works were built without approval?
The developer or authority may apply a fine, depending on the case. Contact us to help you accordingly.
Can you handle the whole process?
Yes: drawings, calculations, the Azizi NOC, the authority permit and completion.