Can I Open Up Walls Inside My Jebel Ali Village Villa?
Often yes, for open kitchens and living rooms. Our engineers first check if the wall carries load. If it does, a beam, calculations, the Nakheel NOC and the Trakhees permit are needed.
If It Is
A steel or concrete beam replaces the wall, designed and stamped by our engineers.
What you need to know
- Villa plans: Nakheel provides villa plans to owners; if they are missing, the villa is surveyed and drawn as built.
- Approved consultant: Submissions to Trakhees are made by an approved consultant, not by the owner.
- VSR: Unapproved works show up in the Villa Status Report (VSR) and need fixing before a sale.
Documents you will need
- Title deed and owner Emirates ID or passport
- Villa plans from Nakheel, or as-built drawings
- Proposed drawings
- Stamped structural calculations for structural works
- Photos of the area
At a glance
Can I Open Up Walls Inside My Jebel Ali Village Villa? at a glance
Who does what, step by step.
| Who | Approval route | Guides |
|---|---|---|
| You and our engineers Step 1 | Your idea, photos and plot details. We get the villa plans from Nakheel and check them against what is built. | — |
| Nakheel (online portal) Step 2 | Reviews the design against its community rules and issues the NOC. | — |
| Trakhees Step 3 | Building permit for structural works. | — |
| Nakheel and Trakhees Step 4 | Inspections and completion. | — |
How it works
How It Works in Jebel Ali Village
Your Idea, Photos and Plot Details
Villa Plans From Nakheel
Sketch and Early Check
Drawings and Structural Calculations
Nakheel NOC via the Nakheel online portal
Trakhees Permit, Works and Completion
Who does what
Three parties, one route
Nakheel
Master developer of Jebel Ali Village. Issues the NOC through its online portal.
Nakheel approvals →Trakhees
Issues the building permit for structural works and inspects at completion.
Trakhees approval →Structural Solutions
Prepares the drawings and stamped calculations and submits to Nakheel and Trakhees for you.
Talk to our engineers →What Jebel Ali Village Owners Ask Us About
- Open Kitchen
- Living Room
- Wider Opening
- Steel Beam
- Wall Removal
- New Doorway
Why applications come back
- Drawings that do not match the villa as it stands
- AutoCAD in DLTM coordinates not supplied where asked
- No stamped structural calculations
- Unapproved works already on the VSR
- Missing owner documents
Questions
Questions owners ask
Can I remove a wall in my Jebel Ali Village villa?
Often yes, after a structural check.
Who approves changes to my Jebel Ali Village villa?
Nakheel issues the NOC through the Nakheel online portal, then Trakhees issues the building permit for structural works.
Do I need full drawings to ask if my idea is possible?
No. Photos and a simple sketch are enough for us to give you an early answer.
Can I get the plans of my villa?
Yes. Nakheel can provide the villa plans. Check them against what is built before design starts.
Related guides
