Kerb & Sidewalk Reinstatement Design Dubai

When a kerb is cut or a footpath is opened for an access, it must be reinstated to RTA standards. We prepare the reinstatement design and details as part of the access approval package.

What Is Reinstated

Kerbs, footpath paving, verges, edge restraints and any disturbed road surface — matched to the existing levels and materials.

First stepRTA Access Design Study
Developer NOCWhere the community has a master developer
DrawingsAutoCAD in DLTM coordinates

What you need to know

  • Linked to the Deposit: Proper reinstatement is checked before the works are accepted and the security deposit is refunded.
  • Order of approvals: RTA access design study → developer plot access NOC → RTA construction NOC → sidewalk modification permit.
  • DLTM drawings: Developers such as Nakheel return drawings that are not PDF plus AutoCAD DLTM.
  • Outside the plot limit: Kerb, verge and interlock works are in the road reserve.
  • No early works: Concept approval alone does not allow works on site.
  • Deposit refund: After the works are inspected and accepted.

Documents you will need

  • Title deed and affection plan
  • Owner passport and Emirates ID copy
  • Survey-based drawings in PDF and AutoCAD DLTM
  • RTA-approved access design (for the developer NOC)

At a glance

Kerb & Sidewalk Reinstatement Design Dubai at a glance

Who does what, step by step.

WhoApproval routeGuides
Structural engineer
Step 1
Surveys the plot and prepares access, kerb and interlock drawings in PDF and AutoCAD DLTM.—
RTA
Step 2
Access design study (concept approval).—
Master developer
Step 3
Plot access, curb cut and interlock NOC where the community has one.—
RTA
Step 4
Construction NOC, then the sidewalk modification permit.—
RTA and developer
Step 5
Inspection after works and security deposit refund.—

How it works

How We Get Your Plot Access Approved

Site Survey & Plot Limits (DLTM)

RTA Access Design Study

Developer Plot Access NOC

RTA Construction NOC

RTA Sidewalk Modification Permit

Works, Handover & Deposit Refund

Who does what

Who approves access works

🛣️

RTA

Reviews the Access Design Study, then issues the Construction NOC and the Sidewalk Modification Permit, and inspects the works.

RTA approvals →
🏘️

Master developer

In communities such as Nakheel, Emaar or Dubai Holding areas, its plot access NOC comes before the RTA permit.

Developer NOC first →
📐

Structural Solutions

Surveys the site, prepares the DLTM drawings and handles the applications for you.

Talk to our engineers →

Projects We Handle

  • Kerb Reinstatement
  • Footpath Reinstatement
  • Verge Reinstatement
  • Road Edge Repair
  • Driveway Closure
  • Access Relocation

Why applications come back

  • Drawings not in AutoCAD DLTM coordinates
  • Works outside the plot limit not shown against a site survey
  • Developer plot access NOC missing in a master community
  • Works started on concept approval only
  • Kerb and footpath reinstatement not detailed

Questions

Questions owners ask

Who reinstates the sidewalk?

The applicant’s contractor, to the approved details.

Does reinstatement affect the deposit refund?

Yes — works are inspected before the deposit is refunded.

Do you prepare the access drawings?

Yes — we survey the site and prepare access, kerb, interlock and tie-in drawings in AutoCAD (DLTM) and PDF.

Can works start before all approvals?

No — access, kerb and interlock works should start only after the RTA construction NOC and sidewalk modification permit are issued.