Prepared after the work is complete, recording the final result including any changes made on site. They are used for completion, future applications and sales.
As-Built vs Shop Drawings: What Is the Difference?
Shop drawings are prepared before or during construction to show how something will be made and installed. As-built drawings are prepared after construction to show what was actually built.
We get your drawings for you
No need to chase the developer or the authority yourself. Send us your title deed, Emirates ID or passport and a signed authorisation letter: we request your approved drawings, or survey the property and prepare new as-built drawings. You receive PDF, and CAD where available.
How to get your property drawings →Request online →WhatsApp us Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Streamlined
Approval process
End-to-end
NOC to permit, managed
Direct access
To your project team
Always on
Client support
Shop Drawings
Prepared by contractors or fabricators — for steel, aluminium, joinery or MEP items — and approved before fabrication, so the work is built correctly.
How We Prepare Your Drawings
01
Site Visit & Measured Survey
02
Existing Documents Reviewed
03
AutoCAD Drafting
04
Engineer Review
05
Stamped Drawings Issued
06
Submission Support
How Our Approval Process Works
Our expert engineers handle the entire NOC process, ensuring faster approvals and full compliance with Dubai regulations.
As-Built Drawings
Situations We Help With
Steel & Aluminium Works
Fit-Outs
Pergolas & Shades
MEP Installations
Extensions
Completion Stage
As-Built vs Shop Drawings at a Glance
| Step | Who | What happens |
|---|---|---|
| 1 | Structural engineer | Prepares the fit-out drawings, structural checks and stamped calculations where needed. |
| 2 | Landlord, building management or mall | Issues the NOC for the works. |
| 3 | Authority — Dubai Municipality, DDA or Trakhees — depending on the community | Reviews the drawings and issues the permit. |
| 4 | Civil Defence (DCD) | Fire and life safety approval where required. |
| 5 | Landlord and authority | Completion inspection. |
Documents Required
- Trade licence
- Tenancy contract or Ejari
- Landlord, building management or mall NOC
- Proposed layout and fit-out drawings
- Structural calculations where loads or openings change
Key Technical Rules
- Landlord or mall NOC: required before the authority submission.
- Authority permit: from DM, DDA, Trakhees or the free zone, depending on the location.
- Civil Defence: fire and life safety approval where the activity requires it.
- Structural check: for new loads, openings or mezzanines.
- Completion inspection: before the unit opens.
Landlord NOC
First approval
Authority Permit
By location
Civil Defence
Where required
Why Owners Choose Structural Solutions for Drawings
Measured On Site
Our team surveys the property in person, so the drawings show what is actually built.
Authority-Ready Formats
Drawings prepared in AutoCAD to the format the reviewing authority or developer expects — DM, DDA, Trakhees or developer requirements.
Engineer Reviewed & Stamped
Every set is reviewed by our engineers and can be stamped for submission.
Get Your Drawings Prepared
Tell us about your property and what the drawings are for — we will survey, draft and deliver drawings ready for submission.
As-Built vs Shop Drawings: What Is the Difference? — FAQs
What is the difference between as-built and shop drawings?
Shop drawings show how something will be built; as-built drawings show what was built.
Who prepares shop drawings?
Contractors or fabricators, often stamped by a consultant.
When are as-built drawings prepared?
After construction is complete.
Do I need both?
Depending on the project, yes.
Do you prepare both?
We prepare as-built drawings and review or stamp shop drawings.
