As-Built Drawings for DEWA in Dubai
Load changes, new connections and solar can need drawings of the property as it is.
DEWA applications such as load changes, new connections, solar panels or a change of use can need drawings that show the property as it stands. We obtain the approved drawings for you, or survey the property and prepare as-built drawings, and work with your MEP contractor, who prepares the electrical and water side of the DEWA submission. You receive PDF, and CAD where applicable.

Official sources: Dubai Municipality · DDA
What we check
- Plans: Floors and rooms
- Changes: Since handover
- Loads: With your MEP contractor
- Solar: Roof layout
- Format: For the submission
- Files: PDF and CAD
Documents you will need
- Title deed or tenancy contract
- Owner or tenant ID
- Existing drawings, if available
- Photos and a short description
Route
Drawings for a DEWA application
The general route. We confirm it for your project.
| Step | Approval route | Guides |
|---|---|---|
| Obtain drawings Structural Solutions | Approved drawings requested for you. | Getting your drawings |
| Survey Our engineers | If the drawings are missing or out of date. | As-built survey |
| As-built set Structural Solutions | Architectural and structural as-built drawings. | — |
| MEP Your MEP contractor | Electrical and water drawings for DEWA. | — |
| DEWA DEWA | Application through the contractor. | DEWA approvals |
| Files You | PDF and CAD. | — |
How it works
How we work
1. Send us the details
Property, area and what you need.
2. Check
Route and documents confirmed.
3. Site
Visit or survey if needed.
4. Design
Drawings and calculations by our engineers.
5. Submission
By us.
6. Follow-up
Comments until approval.
Related questions
What causes problems
- Old drawings not matching
- Changes not shown
- MEP drawings missing
Need help with this?
Get your route confirmed
Send us three things on WhatsApp:
- Property and area
- What you want to do
- Any drawings you have
Our engineers confirm the route, prepare the drawings and handle the submissions.
Questions
Questions
Who submits to DEWA?
Usually your MEP or electrical contractor; we provide the as-built drawings.
Can you get the original drawings?
Yes, we request them for you.
What if the villa was changed?
We survey it and draw it as it is.
How do I contact you?
Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.
Related guides
