Al Furjan Villa Maid Room Extension NOC
Adding a maid room to an Al Furjan villa requires a Nakheel Home Modification NOC and a Trakhees CED Building Permit. AGFA fees apply for the enclosed BUA added. Al Furjan uses Trakhees — not DM or DDA. Extensions stay within the existing villa footprint, so a maid room is usually made by converting the garage or an existing room, or built over a single-storey part. Structural Solutions manages the complete Nakheel NOC and Trakhees permit for maid room extensions across all Al Furjan sub-communities.
What is Required for an Al Furjan Maid Room Extension NOC?
An Al Furjan maid room extension requires structural and architectural drawings in Trakhees CED format, followed by Nakheel NOC submission and Trakhees CED building permit. AGFA fees apply for enclosed BUA. Al Furjan community guidelines require external materials to match the original villa palette. Extensions stay within the existing villa footprint, with setbacks of at least 1.2 m. The added area fee is confirmed at Nakheel conditional NOC stage before construction. Planning a villa extension in Al Furjan as well? See our main guide for the full Nakheel NOC and Trakhees permit process.
What you need to know
- Added area fee: Nakheel charges for the added built-up area, currently about AED 1,400 per sq ft in Al Furjan, confirmed with the Nakheel NOC. Our engineers measure the added area before design.
- Footprint and setbacks: extensions stay within the existing villa footprint, with setbacks of at least 1.2 m.
- Counts as GFA: added floor area is reviewed as additional GFA by the developer and the authority.
- Existing structure checked: foundations, columns and slabs are checked for the new loads.
- Matching design: external finishes and rooflines must match the original villa.
- Completion inspection: required before the extension is used, sold or handed over.
Documents you will need
- Title deed (or tenancy contract plus landlord NOC for tenants)
- Owner passport and Emirates ID copy
- Affection plan / site plan
- Existing approved drawings — or an as-built survey if you have none
- Proposed drawings and stamped structural calculations
At a glance
Al Furjan Villa Maid Room Extension NOC at a glance
Who does what, step by step.
| Who | Approval route | Guides |
|---|---|---|
| Structural engineer Step 1 | Checks the villa footprint and setbacks, designs the extension and prepares stamped drawings and calculations. | — |
| Nakheel (master developer) Step 2 | Issues the community NOC against its design guidelines. | — |
| Building authority — Trakhees Step 3 | Building permit; work starts only after it is issued. | — |
| Developer and authority Step 4 | Completion inspection and sign-off. | — |
How it works
Al Furjan Maid Room Extension NOC Process
Footprint & Setback Feasibility Check
Structural & Architectural Drawings (Trakhees CED Format)
Nakheel NOC Submission
Nakheel DRC Review — AGFA Fee Confirmed
Trakhees CED Building Permit
Completion Inspection and Certificate
Who does what
Three parties, one route
Nakheel
Master developer of Al Furjan. Issues the NOC; we apply as your consultant.
Nakheel approvals →Trakhees
Issues the building permit for structural works and inspects at completion.
Trakhees approval →Structural Solutions
Prepares the drawings and stamped calculations and submits to Nakheel and Trakhees for you.
Talk to our engineers →Maid Room & Service Extension Types in Al Furjan
- Maid Room Extension
- Driver Room Addition
- Combined Maid & Driver Room
- Service Block Extension
- Laundry Room Addition
- Store Room Extension
Why applications come back
- Drawings that do not match the villa as it stands
- AutoCAD in DLTM coordinates not supplied where asked
- No stamped structural calculations
- Unapproved works already on the VSR
- Missing owner documents
Questions
Questions owners ask
Does Al Furjan use Trakhees or DM for maid room extensions?
Trakhees CED Building Permit. Al Furjan is a Nakheel community under Trakhees.
What AGFA fee applies to an Al Furjan maid room extension?
Nakheel charges about AED 1,400 per sq ft of added built-up area in Al Furjan, confirmed with the NOC. Our engineers measure the added area before design.
Can a maid room be built in the garden?
No. Extensions in Al Furjan stay within the existing villa footprint, so a maid room is usually made by converting the garage or an existing room, or built over a single-storey part. Our engineers confirm what fits your villa.