Grease Trap Not Approved in Dubai: What Now?
A grease trap comment can hold a food approval even when the rest of the layout is ready.
If your grease trap was not approved, the usual reasons are its size for the kitchen, its position, access for cleaning, or how the sinks and floor drains connect to it. The grease trap is part of the drainage design and the environmental approval for the restaurant, and the comment explains what has to change. We read the comment, check the kitchen and the drainage, redesign the trap and its connections, and resubmit. If the unit has no space or no drainage route, we look at the options with the landlord.
Why
Common grease trap comments
| Comment | What we change |
|---|---|
| Size | Trap sized again for the kitchen and its sinks |
| Position | Moved for access and drainage |
| Cleaning access | Access cover and route kept clear |
| Connections | Sinks and floor drains connected correctly: plumbing and drainage design |
| Environmental NOC | grease trap NOC |
Official sites: Dubai Municipality
What you need to know
- Read the comment.
- Size and position most common.
- Access for cleaning.
- Resubmit the design.
Documents you will need
- The rejection comment
- Kitchen layout
- Drainage drawings
- Photos of the trap location
How it works
Fixing a grease trap comment
1. Read
Comment.
2. Check
Kitchen.
3. Redesign
Trap.
4. Coordinate
Landlord.
5. Resubmit
Drawings.
6. Approve
Install.
Questions
Grease trap rejected: questions
Why was my grease trap rejected?
Usually its size, position, cleaning access or connections. The comment tells us which.
Can the grease trap be inside the kitchen?
It depends on access and the building; we position it with the landlord.
Do I need a grease trap at all?
How much does it cost?
Our fee depends on the drawings and the scope; we review and advise.
Who can help?
Structural Solutions redesigns grease traps and drainage for food approvals in Dubai. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.
Related guides
