Do I Need a Grease Trap for My Cafe in Dubai?
Cafe owners often ask whether a coffee machine and a small pantry really need a grease trap.
In most cases, yes: a cafe that cooks, prepares food or washes dishes and utensils sends grease into the drains, so the sinks connect to a grease trap. A unit that only serves packaged items with no washing may be different. It is decided on the drawings for your unit, together with the landlord, who may already have a central trap. We look at your menu, equipment and sinks, design the drainage and show the grease trap on the drawings for approval.
Quick check
When a cafe needs a grease trap
| Your cafe | Grease trap? |
|---|---|
| Cooks or prepares food | Yes, usually |
| Washes dishes and utensils | Yes, usually |
| Coffee and pastries only, with a sink | Usually, depends on the sinks |
| Packaged items only, no washing | May not; decided on the drawings |
| Building has a central trap | Connection shown on the drawings |
Official sites: Dubai Municipality
What you need to know
- Usually yes.
- Depends on sinks and menu.
- Landlord may have one.
- We design it.
Documents you will need
- Menu
- Equipment and sink list
- Landlord NOC
- Unit plan
How it works
Deciding on a grease trap
1. Menu
Check.
2. Sinks
Count.
3. Landlord
Ask.
4. Design
Drainage.
5. Submit
Drawings.
6. Install
Trap.
Questions
Grease trap for a cafe: questions
Does a coffee shop need a grease trap?
Usually, because cups, jugs and utensils are washed. It is decided on your drawings.
Where does the grease trap go?
Where it can be cleaned and connected; we position it with the landlord.
My grease trap was rejected. What now?
How much does it cost?
Our fee depends on the drawings and the scope; we review and advise.
Who can help?
Structural Solutions designs cafe drainage and grease traps in Dubai. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.
Related guides
