Plumbing and drainage design for a fit-out in Dubai

Plumbing and drainage design for a fit-out covers water supply, drainage routes and connection points for pantries, washrooms and sinks, stamped for approval.

The short answer

Where a shop, office or café fit-out adds a pantry, sink or washroom, we design the water supply and drainage: pipe routes, falls, connections to the mall or building points, and any water heaters. Restaurants and cafés need more, such as grease traps, which the food safety review checks. The plumbing drawings are part of the MEP package for the mall or landlord and the authority.

CoversWater and drainage
ForPantries, sinks, washrooms
Connects toMall or building points

Plumbing and drainage design for a fit-out: what you need to know

  • Drain routes: Falls to the available connection points.
  • Water supply: Pipe sizes and heaters.
  • Restaurants: Grease traps and food safety needs.
  • Coordination: With the floor build-up and ceiling.

What to send us

  • Interior design layout and ceiling plan
  • Mall or landlord fit-out guide
  • Lease or tenancy contract
  • Trade licence
  • Existing MEP drawings, if available

Who does what

From design to opening

We confirm the exact route for your mall or building.

StepApproval routeGuides
MEP design and calculations
Structural Solutions
HVAC, lighting and power, fire alarm, sprinklers, plumbing, with calculations.MEP package
Landlord or mall approval
Consultant → mall or landlord
Stamped drawings reviewed by the mall or landlord fit-out team.Consultant stamp
Authority permit, where needed
Consultant → DM, DDA or Trakhees
Depending on the area and the mall or building.Authority permit
Civil Defence (DCD)
Structural Solutions → DCD
Fire and life safety approval, needed for every fit-out change.DCD approval
Final inspection
Mall, authority and DCD
DCD final inspection and completion before opening.Sign-off

How it works

How it works

1. Brief

Layout, ceiling plan and the landlord guide.

2. Design

MEP design and calculations.

3. Approvals

Mall or landlord, authority and DCD.

4. Handover

Final inspection and completion.

Questions

More questions about plumbing and drainage design for a fit-out

Can I add a sink anywhere?

Only where it can reach a drainage point.

Do restaurants need grease traps?

Yes, checked in the food safety review.

Is plumbing part of the MEP package?

Yes.

Do you prepare a BOQ?

No.