Al Manara · As-built and completion · Updated November 2026

Al Manara Villa As-Built and Completion Certificate

Al Manara is a villa area between Umm Suqeim and Sheikh Zayed Road, with family villas that are often extended or modernised.

Standalone villas in Al Manara are under Dubai Municipality, with no developer NOC. Typical files here are an extension or a pool added by an earlier owner, a modernised facade with structural changes behind it, or a permit that was never closed. We survey, check the structure, prepare the as-built drawings and advise before submitting to Dubai Municipality.

AuthorityDubai Municipality
Developer NOCNone on standalone plots
We handleAs-built and completion

Typical cases

Al Manara villa files

CaseGuide
Extra rooms added years agoOld extension as-built
Pool built without approvalExisting pool
Permit opened, never closedStuck permit
Outdoor kitchen or gazeboOutdoor kitchen
Selling the villaCompletion to sell

Next

Related guides

TopicGuide
All DM villa areasvilla as-built approval with Dubai Municipality
DM villa completion certificateCompletion certificate
Old extensionsOld villa extension as-built

Official sites: Dubai Municipality | Dubai Building Code

What you need to know

  • Dubai Municipality only.
  • No developer NOC.
  • We survey and submit.
  • Completion at the end.

Documents you will need

  • Title deed and owner ID
  • Affection plan
  • Any old permit or drawings
  • Photos of the villa and additions

How it works

Al Manara villa file, in order

1. Send

Plot number.

2. Survey

Villa.

3. Check

Structure.

4. Draw

As-builts.

5. Submit

DM.

6. Close

Completion.

Questions

Al Manara villa as-built: questions

My Al Manara villa was renovated with walls removed. Does that need an as-built?

Structural changes are part of the file. We check them and include them in the as-built drawings.

Is the route different from Umm Suqeim?

No. Both are Dubai Municipality areas with standalone villa plots.

Is there a developer NOC for villas in Al Manara?

Not on standalone villa plots. The file goes to Dubai Municipality, submitted by an approved consultant such as Structural Solutions.

Will Dubai Municipality fine me for old works in Al Manara?

The authority may apply a fine, depending on the case.

How much does a villa as-built approval cost?

Our fee depends on the drawings and the scope; we review and advise. Any Dubai Municipality fees, or a fine where one applies, are separate and depend on the case.

Who can help?

Structural Solutions handles as-built approval and the completion certificate for villas in Al Manara. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.

Related guides

Keep reading