Al Twar Villa As-Built and Completion Certificate
Al Twar 1, 2 and 3 are family villa areas near Al Qusais, with many villas that have been extended more than once.
Villas in Al Twar are standalone plots under Dubai Municipality, with no developer NOC. Extensions here often date from different owners and different periods, so the drawings on file rarely match what stands on site. We survey the villa, compare it with any old permit, check the structure of the additions and prepare the as-built drawings, then advise before submitting to Dubai Municipality.
Typical cases
Typical in Al Twar
| Case | Guide |
|---|---|
| Built differently from the permit | Works do not match |
| Extra rooms added years ago | Old extension as-built |
| Roof room or extra floor | Floor addition |
| Car shade over the driveway | Car shade |
| Original contractor no longer around | Without the contractor |
Next
Related guides
| Topic | Guide |
|---|---|
| All DM villa areas | villa as-built approval with Dubai Municipality |
| DM villa completion certificate | Completion certificate |
| Old extensions | Old villa extension as-built |
Official sites: Dubai Municipality | Dubai Building Code
What you need to know
- Dubai Municipality only.
- No developer NOC.
- We survey and submit.
- Completion at the end.
Documents you will need
- Title deed and owner ID
- Affection plan
- Any old permit or drawings
- Photos of the villa and additions
How it works
Al Twar villa file, in order
1. Send
Plot number.
2. Survey
Villa.
3. Check
Structure.
4. Draw
As-builts.
5. Submit
DM.
6. Close
Completion.
Questions
Al Twar villa as-built: questions
The drawings for my Al Twar villa do not match the site. Is that a problem?
It is common. We survey what was built and compare it with the approved drawings. See works that do not match.
The contractor who built my extension has closed. Can you still help?
Is there a developer NOC for villas in Al Twar?
Not on standalone villa plots. The file goes to Dubai Municipality, submitted by an approved consultant such as Structural Solutions.
Will Dubai Municipality fine me for old works in Al Twar?
The authority may apply a fine, depending on the case.
How much does a villa as-built approval cost?
Our fee depends on the drawings and the scope; we review and advise. Any Dubai Municipality fees, or a fine where one applies, are separate and depend on the case.
Who can help?
Structural Solutions handles as-built approval and the completion certificate for villas in Al Twar. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.