Villa Majlis and Guest Annex As-Built Approval
A majlis or guest annex in the garden is one of the most common additions on older villa plots, and one of the most common to have been built without a permit.
A villa majlis or guest annex as-built approval brings a built majlis, guest annex or separate block into the villa's approved file. It matters because the annex sits on the plot as a separate structure: setbacks, its distance from the main villa and the boundary wall, and its own structure all count. We survey the annex and the plot, check its structure, prepare as-built drawings of the whole plot and tell you what your case needs before anything goes to Dubai Municipality. The authority may apply a fine, depending on the case. If you are planning a new majlis rather than one already built, it follows the new works route instead.
What we check
What matters for a built majlis or annex
| Item | Why it matters |
|---|---|
| Position on the plot | Setbacks and distance to the boundary and the villa |
| Height and roof | Plot rules for ancillary buildings |
| Structure | Foundations, walls and roof slab of the annex |
| Services | Kitchen, toilets and drainage inside the annex |
| Use | Majlis, guest room or service block are treated differently |
Built or planned
Built already, or still planned?
| Your case | Route | Guide |
|---|---|---|
| Majlis already built | As-built route | villa as-built approval with Dubai Municipality |
| Service block already built | As-built route | Service block |
| New majlis in Mirdif | New works | Majlis in Mirdif |
| New majlis in Jumeirah | New works | Majlis in Jumeirah |
| New majlis in Umm Suqeim | New works | Majlis in Umm Suqeim |
Official sites: Dubai Municipality | Dubai Building Code
What you need to know
- Separate structure on the plot.
- Setbacks count.
- Survey of the whole plot.
- Planned majlis: new route.
Documents you will need
- Title deed
- Affection plan
- Photos inside and outside the annex
- Any drawings of the annex
How it works
Majlis or annex, step by step
1. Photos
Annex and plot.
2. Survey
Whole plot.
3. Structure
Annex.
4. Draw
As-builts.
5. Advise
Your case.
6. Submit
To DM.
Questions
Majlis and annex: questions
Can I get approval for a majlis that is already built?
It depends on where it sits on the plot and how it is built. We survey and check it, then tell you what your case needs. Contact us for more details.
Does a guest annex count as an extension?
It is an addition on the plot, so it belongs in the villa's approved file.
Can the annex have its own kitchen?
It depends on its use and your plot rules. We check it as part of the survey.
Is a fine possible?
The authority may apply a fine, depending on the case.
How much does a villa as-built approval cost?
Our fee depends on the drawings and the scope; we review and advise. Any Dubai Municipality fees, or a fine where one applies, are separate and depend on the case.
Who can help?
Structural Solutions surveys and files built majlis and annex additions with Dubai Municipality. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.
Related guides
Keep reading
From our guides
