Telecom · Height · Updated November 2026

Telecom Tower Height Clearance in Dubai: DCAA Approval

Tall structures near airports and flight paths can affect aircraft. In Dubai, the height of a telecom tower in those areas is cleared by the Dubai Civil Aviation Authority.

Near Dubai's airports and flight paths, a telecom tower needs a height clearance from the Dubai Civil Aviation Authority (DCAA) before it can be built. The application gives the exact location, the ground level and the full height including the antennas and the lightning rod. DCAA may set a maximum height or ask for aviation lighting and marking. The clearance goes with the building permit from the authority for the area. We prepare the structural side and the height data for the application.

Issued byDCAA
WhereNear airports and flight paths
May requireLighting and marking

Application

What DCAA needs

ItemDetail
LocationExact coordinates
Ground levelFrom the site survey
Full heightIncluding antennas and lightning rod
Structure typeTower, mast or rooftop

Possible conditions

What DCAA may ask for

ConditionEffect on design
Height limitTower or mast kept below it
Aviation lightsFixings and cable route on the tower
MarkingPainted bands on the structure

Official sites: Dubai Civil Aviation Authority

What you need to know

  • DCAA clears height.
  • Full height counts.
  • Lights may be needed.
  • With the building permit.

Documents you will need

  • Site coordinates
  • Ground level
  • Tower height with antennas
  • Site plan

How it works

Height clearance steps

1. Location

Coordinates.

2. Height

Full height.

3. Apply

DCAA.

4. Conditions

If any.

5. Design

Lights, marking.

6. Permit

Area authority.

Questions

Height clearance: questions

Do telecom towers need height approval in Dubai?

Near airports and flight paths, yes, from the Dubai Civil Aviation Authority (DCAA).

Does the antenna height count?

Yes, the full height including antennas and the lightning rod.

Can DCAA require aviation lights?

Yes, and we allow for them in the design.

Is there a DCAA page for Dubai South?

Yes. See the DCAA NOC in Dubai South.

How much does it cost?

Our fee depends on the drawings and the scope; we review and advise.

Who can help?

Structural Solutions prepares the structural and height data for DCAA applications. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.

Related guides

Keep reading