Aviation · DCAA · Updated November 2026

DCAA NOC in Dubai: Height Clearance Near the Airports

Around Dubai International and Al Maktoum International airports, the height of what you build is controlled. The Dubai Civil Aviation Authority (DCAA) clears it.

A DCAA NOC is the height clearance from the Dubai Civil Aviation Authority for works near Dubai airports and their flight paths. Villa extensions in areas close to Dubai International Airport, such as Al Garhoud, Al Rashidiya and Mirdif, need it, as do projects in Dubai South around Al Maktoum International and tall structures like telecom towers near airports. The DCAA clearance sits alongside the building permit from the authority for the area. We prepare the drawings and include the DCAA step in the permit file for the works we design.

Issued byDubai Civil Aviation Authority
WhereNear airports and flight paths
WithThe building permit

Where it applies

Who needs a DCAA NOC

CaseGuide
Villa extensions in Al Garhoud, Al Rashidiya, Mirdifvilla extensions
Projects in Dubai SouthDCAA in Dubai South
Telecom towers near airportstelecom tower height clearance
Expo CityNo DCAA approval: DCAA in Expo City

Areas near DXB

Villa areas we see most

AreaGuide
Al GarhoudAl Garhoud villas
Al RashidiyaAl Rashidiya villas
MirdifMirdif villas

Official sites: Dubai Civil Aviation Authority | Dubai Municipality | DDA

What you need to know

  • DCAA clears height.
  • Near DXB and DWC.
  • Villa extensions included.
  • With the building permit.

Documents you will need

  • Title deed and affection plan
  • Proposed drawings with heights
  • Site location
  • Building permit application details

How it works

DCAA in the permit, step by step

1. Check

Location.

2. Design

Heights.

3. DCAA

Clearance.

4. Permit

Authority.

5. Build

Works.

6. Complete

Inspection.

Questions

DCAA NOC: questions

When do I need a DCAA NOC in Dubai?

For works near Dubai airports and their flight paths, including villa extensions in areas like Al Garhoud, Al Rashidiya and Mirdif, projects in Dubai South and tall structures such as telecom towers.

Does a villa extension near the airport need DCAA approval?

Yes, in areas close to Dubai International Airport such as Al Garhoud, Al Rashidiya and Mirdif.

Do I need DCAA approval in Dubai South?

Yes, projects in Dubai South need it. See DCAA for Dubai South projects.

Is DCAA needed in Expo City?

No. See DCAA in Expo City.

Does DCAA replace the building permit?

No. It sits alongside the permit from the authority for the area.

How much does it cost?

Our fee depends on the drawings and the scope; we review and advise.

Who can help?

Structural Solutions includes the DCAA height clearance in the permits for the works we design near Dubai airports. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.

Related guides

Keep reading