Site Hoarding, Site Access and Night Works NOC on a Meraas Plot
Before the contractor moves onto a Meraas plot, DCM approves the site set-up: the hoarding at the plot boundary, the construction access and the mobilization area.
On a Meraas plot, the site set-up needs DCM NOCs: hoarding at the plot boundary, construction site access, mobilization and lay-down, and site access for the soil investigation, piling and the topographic survey. If works must run at night, DCM issues a separate night works NOC. These NOCs come with the DDA permit, before the works start. We apply for them with your contractor and keep them in step with the programme.
Site NOCs
What the set-up needs
| NOC | Needed for |
|---|---|
| Hoarding at the plot boundary | Fencing the site |
| Construction site access | Vehicles during works |
| Mobilization and lay-down | Site cabins and storage |
| Soil investigation access | Boreholes before design |
| Piling access | Rigs and early works |
| Topographic survey access | Survey teams |
| Night works | Works outside normal hours |
Communities
Where this applies
The same step applies on the Meraas plots in Pearl Jumeirah, Naia Island, Jumeirah Bay, La Mer, Al Wasl (Le Hemaira) and Umm Al Sheif.
| Community | Guide |
|---|---|
| Pearl Jumeirah | Pearl Jumeirah villa approvals |
| Naia Island | Naia Island villa approvals |
| Jumeirah Bay | Jumeirah Bay villa approvals |
| La Mer | La Mer villa approvals |
| Al Wasl (Le Hemaira) | Al Wasl (Le Hemaira) villa approvals |
| Umm Al Sheif | Umm Al Sheif villa approvals |
Official sites: DDA
What you need to know
- DCM issues them.
- Before works start.
- Night works separate.
- With your contractor.
Documents you will need
- DDA permit
- Site logistics plan
- Hoarding layout
- Contractor details
How it works
Site set-up steps
1. Plan
Site logistics.
2. Hoarding
Layout.
3. DCM
Site NOCs.
4. Mobilize
Contractor.
5. Night
If needed.
6. Works
Start.
Questions
Site set-up: questions
Do I need a hoarding NOC on a Meraas plot?
Yes, from DCM, before works start.
Is night work allowed?
Only with a DCM night works NOC.
Does the soil investigation need access approval?
Yes, DCM site access for the investigation team.
What about works in the road?
See the right of way NOC.
How much does it cost?
Our fee depends on the drawings and the scope; we review your plot and advise. DCM, DDA, Civil Defence and service provider fees are separate, and we list them before you commit.
Who can help?
Structural Solutions handles every DCM, Civil Defence and DDA step for new villas on Meraas plots. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.
Related guides