DDA Building Permit for a New Villa on a Meraas Plot
The DDA building permit is the approval that lets construction start on a Meraas plot. It comes after the DCM design NOC and the Civil Defence approval.
To get a DDA building permit for a new villa on a Meraas plot, the design needs the DCM community NOC and Civil Defence approval first. We then submit the architectural, structural and MEP drawings to DDA, with the plot documents. DDA reviews the design against its rules and the Dubai Building Code, and issues the permit once any comments are closed. Works start only after the permit is issued, and DDA inspects the works during construction before the completion certificate.
Submission
What goes to DDA
| Item | Prepared by |
|---|---|
| Affection plan and plot rules | DCM, obtained by us |
| DCM community NOC | We obtain it |
| Civil Defence approval | We obtain it |
| Architectural drawings | Your architect or us |
| Structural design and calculations | Structural Solutions |
| MEP drawings | Structural Solutions |
| Contractor details | Your contractor |
After the permit
What DDA does next
| Stage | What happens |
|---|---|
| Construction | DDA inspections at set stages |
| Changes to the design | Revised drawings back to DCM and DDA |
| End of works | the completion certificate |
Communities
Where this applies
The same step applies on the Meraas plots in Pearl Jumeirah, Naia Island, Jumeirah Bay, La Mer, Al Wasl (Le Hemaira) and Umm Al Sheif.
| Community | Guide |
|---|---|
| Pearl Jumeirah | Pearl Jumeirah villa approvals |
| Naia Island | Naia Island villa approvals |
| Jumeirah Bay | Jumeirah Bay villa approvals |
| La Mer | La Mer villa approvals |
| Al Wasl (Le Hemaira) | Al Wasl (Le Hemaira) villa approvals |
| Umm Al Sheif | Umm Al Sheif villa approvals |
Official sites: DDA | Dubai Civil Defence
What you need to know
- DDA issues it.
- DCM and DCD first.
- No works before it.
- Inspections follow.
Documents you will need
- DCM community NOC
- Civil Defence approval
- Full drawing set
- Contractor trade licence copy
How it works
Getting the DDA permit
1. DCM
Design NOC.
2. DCD
Fire safety.
3. Submit
To DDA.
4. Review
Comments closed.
5. Permit
Issued.
6. Build
With inspections.
Questions
DDA permit: questions
Is it DDA or Dubai Municipality on a Meraas plot?
DDA issues the building permit on these plots.
Can works start before the permit?
No. Works start only after DDA issues it.
What if the design changes during construction?
The revised drawings go back to DCM and DDA.
What comes before the permit?
How much does it cost?
Our fee depends on the drawings and the scope; we review your plot and advise. DCM, DDA, Civil Defence and service provider fees are separate, and we list them before you commit.